US Army Corps of Engineers
Jacksonville District Website

Environmental Documents

Printing Note:  Some documents contain pages of various sizes and orientation. You may need to use printer settings such as "scale to fit" or "auto landscape-portrait."

Environmental Documents (not by county)

Collapse All Expand All

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

District Wide

Gulf Regional Biological Opinion

Coastal Dredging and Construction, Gulf of Mexico (National Marine Fisheries Service)

Gulf Regional Biological Opinion 
-
2003 Original Opinion
-2005 revision
-2007 revision
-Management Protocol, revision 1, Apr 2010

 

 

South Atlantic Regional Biological Opinion

Coastal Dredging and Construction, South Atlantic Coast (National Marine Fisheries Service)

2020 South Atlantic Regional Biological Opinion for Dredging and Material Placement Activities in the Southeast United States

South Atlantic Regional Biological Opinion
-1991 (original opinion)
-1995
-April 1997
-November 1997
-South Atlantic Division Protocol

2020 South Atlantic Regional Biological Opinion

   
Updated-Statewide Programmatic Biological Opinion (2015-SPBO) Beach Placement and Shore Protection, Coast of Florida  2015-SPBO March 13 2015  
2011-Statewide Programmatic Biological Opinion Beach Placement and Shore Protection, Coast of Florida  Statewide Programmatic Biological Opinion, Beach Placement and Shore Protection (Superceded by 2015-SPBO)

Statewide Programmatic Biological Assessment (SPBA) to the U.S. Fish and Wildlife Service

Jacksonville District Commitments in the SPBA

Amendments for 2013 emergency coastal and navigation projects (click on date→)

Aug 22 2011









Feb 17 2011

 

 

Jun 28 2013 (South FL)

Jul 2 2013 (North FL)

 Aug 22 2013

 
Programmatic Piping Plover Biological Opinion Beach and Near Shore Placement and Shore Protection, Peninsula of Florida  P3BO
Amendments for 2013 emergency coastal and navigation projects (click on date→)

May 22 2013



Jun 28 2013 (South FL)

Jul 2 2013 (North FL)

 
Coastal Dredging and Beach Work in Florida  SPBO, SARBO,P3BO, GRBO, SAD Protocol, P&S  Timeline Graphic, 11" X 17" (2-sided) March 2015  
Cooperative Agreement on Manatees, Section 112(c) Marine Mammal Protection Act  Civil Works Activities Affecting Manatees in Florida  Treatment of Manatees and Coordination with the U.S. Fish and Wildlife Service Dec 19 2012  
 Manatee Detection  Demonstration of Commercial Off-the-Shelf Acoustic Technologies  Technical Note, ERDC TN-DOER-E35  Dec 2012  
 Wetland Mitigation  Compliance with Section 2036 WRDA 2007  Template for Mitigation Plan or Mitigation Summary  Aug 2015  
Southwest Florida Comprehensive Watershed Plan Comprehensive Watershed Plan a habitat quilt tied by Threads of Water reconnecting a sustainable landscape Southwest Florida Comprehensive Watershed Plan    
Draft Programmatic Agreement Section 106 of the National Historic Preservation Act

Jacksonville District Operations, Navigation, and Shore Protection Programs 

9 Oct 2020  
 

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Other Locations

Kings Bay Navy Submarine Base

Maintenance Dredging, Camden County, Georgia

Statement of Findings, Department of the Army Permit

Jun 4 2014

 

Stockton, California  San Francisco Bay to Stockton California, Navigation Study 

Final Integrated General Reevaluation Report and Environmental Impact Statement

Final Programmatic Agreement

Appendix A

Appendix B

Appendix C

Appendix D

Appendix E

Appendix F

Appendix G

Appendix H

Appendix I, Part 1

Appendix I, Part 2

Appendix J

6 Mar 2020

 

 

 

 

 

 

 

 

 

 

21 April 2020

 

 

 

County/ Project

Proposed Action

Notices & Documents

Date Issued

Date Due

Puerto Rico

Caño Martín Peña Final Feasibility Report Delivery Package Appendices

A-C National Ecosystem Restoration Benefits Evaluation-Scenario Average Concentrations-Recreation Resources Assessment

D-F Cost Engineering-Adaptive Management Plan-Monitoring Plan

G-Engineering
        
H-Final Environmental Impact Statement

H1-Essential Fish Habitat Assessment
 February 2016  














 
Loiza Cap Section 14 Project    Final Main Report and Appendices May 2018  
Fort San Geronimo, CAP 103 Coastal Storm Damage Reduction Final Mitigation Plan Feb 2011  
Rio Culebrinas, Flood Control, Section 204 CAP Detailed Project Report

Main Text

EA

Appendices

- A, Hydrology & Hydraulics

-B, Geotechnical

-C, Design & Cost

-D, Real Estate

-E, Economics

June 2004  
    Application for Coastal Zone Consistency Concurrence Oct 16 2014  
San Juan Harbor Navigation Project Mitigation

Final FONSI

Final EA
-Through Append D

 -Append E,

Geotech


High Res drawings (11"X17")

 

Mar 2 2015










 
 
  Ocean Dredged Material Disposal Site (ODMDS)  Site Management and Monitoring Plan (SMMP) Jan 6 2011  
San Juan Harbor Navigation Study  Feasibility Study and EA

Notice of Intent and Public Scoping Meeting

Announcement, Public Scoping Meeting 

Anuncio, Reunión de Consulta Publica

Final Report - San Juan Harbor 

Signed FONSI

Signed Chief's Report

Appendix A - Engineering

Appendix B - DMMP 

Appendix C - Economics 

Appendix D - Cost 

Appendix E - Real Estate 

Appendix F - NMFS-ESA-EFH

Appendix G - USFWS-CAR

Appendix H - CZMA

Appendix I - 404b 1 Evaluation

Appendix J - Correspondence

Appendix K - Condado WQC

Sep 28 2015 -

Oct 1 2015 

Oct 1  2015

 

August 2018

 

 

 

 

 

 








 
Rio Puerto Nuevo Flood Control Project  

Revised Mitigation Plan

Project Plans

Third Quarterly Report 

Continuing Construction Validation Report

Mar 2014

2003

2015 Apr 21

Mar 2020

 
Highway 187, Piñones  

New Mitigation Plan

Letter to Agencies 

Sep 2013

Oct 2 2013

 
Rio de la Plata, Flood Risk Management Wetland Delineation and Mitigation -Wetland Delineation (170MB)

-Wetland Boundary Map (35MB)

Final Mitigation Plan 
-Monitoring, Initial
-Monitoring, 6-months
-Project Plan View (2015)

- Second Monitoring Report
-Third Monitoring Report 

2008

 

 

May 2010

 

 

2015 March 15  2016 February

 
Section 408 Alterations Low-Impact Alterations to USACE Federally Authorized Civil Works Projects Conducted by Non-Federal or Independent Requestors FONSI
Programmatic EA
   
Antilles Building Real Estate Disposal Draft EA and FONSI
NOA English
NOA Espanol
Oct 11 2016 Nov 10 2016
Rio Anton Ruiz CAP
Section 1135
Final Integrated Feasibility Report and Environmental Assessment

Final Integrated Feasibility Report and Environmental Assessment

Draft Supplemental EA

9 Feb 2018

 

 

12 May 2020

 

 

 

11 June 2020 

Rio Grande de Manati at Barceloneta
Section 205
Flood Control Final Detailed Project Report and Environmental Assessment  March 1994  
Rio Descalabrado  Flood Control Final DPR & EA  

Final Natural Resource Assessment & Conceptual Mitigation Plan 
Feb 2006

Oct 2000
 
Salud Creek at San Germán CAP Section 14 Project Draft Integrated Feasibility Report and Environmental Assessment  Notice of Availability

Aviso de Disponibilidad

Executive Summary

Resumen Ejecutivo

Final Integrated Feasibility Report and Environmental Assessment 
 

3 August 2018

 

 

 

 

19 Feb 2019

3 September 2018
Puerto Rico Coastal Study   Feasibility Study 

Scoping Letter 

Scoping Letter - Spanish   

WRRDA Letter - NFS

Draft Integrated Feasibility Report and Environmental Assessment

Draft Appendix A

Draft Appendix B

Draft Appendix C

Draft Appendix D

Draft Appendix E

Draft Appendix F

Draft Appendix G

Draft Appendix H

Draft Appendix I

Study Overview and Tentatively Selected Plan Placemat

16 Oct 2018 



30 Nov 2018

20 Nov 2020

 

 

 

 

6 Jan 2021

San Juan Metro Area Coastal Storm Damage Reduction Study   Feasibility Study 

Scoping Letter

Scoping Letter - Spanish 

WRRDA Letter - NFS

NOA Postcard

Draft Integrated Feasibility Study and Environmental Assessment

Proposed FONSI

Appendix A: Engineering

Appendix B: Cost Sharing and Risk Analysis

Appendix C: Economic Analysis

Appendix D: Geotechnical Analysis

Appendix E: Real Estate

Appendix F: Plan Formulation

Appendix G: Environmental  

Appendix H: Pertinent Correspondence

Appendix I: Cultural Resources

16 Oct 2018 



30 Nov 2018

28 Jul 2020

 

 

 

26 Aug 2020

Rio Culebrinas, Aguada and Aguadilla, Puerto Rico Feasibility Study Section 205 Flood Risk Reduction CAP Conversion 

Draft EA

Draft Appendix A

Draft Appendix B

Draft Appendix C

Draft Appendix D

Draft Appendix E-1

Draft Appendix E-2

Draft Appendix E-3

Draft Appendix E-4

20 Feb 2019

 

 

 

 

 

 

 

 

20 April 2019