South Florida Ecosystem Restoration (SFER) Program Structure

 

South Florida Ecosystem Restoration (SFER) Program Structure diagram

2022 Integrated Delivery Schedule (IDS)

The 2022 Integrated Delivery Schedule (IDS) provides the roadmap for sequencing of planning, design, construction and operations of both federal and state projects related to Everglades restoration.

South Florida Ecosystem Restoration (SFER) Program Structure diagram

 

Cover of 2015 - 2020 Momentum Report to Congress - Comprehensive Everglades Restoration Plan - Central and Southern Florida Project

Read, download and share the 2015 - 2020 CERP Report to Congress - Comprehensive Everglades Restoration Plan

Click the image below to read through the pages of the 2015 - 2020 Report to Congress on the Comprehensive Everglades Restoration Plan. You can also share, save and download the Report to Congress!
*** Firefox or Chrome recommended for downloads - it may take several minutes to download due to large file size***

Click the image to read, download and share the 2015 -2020 CERP Report to Congress on the Comprehensive Everglades Restoration Plan

Contact

561-801-5734

Follow us on Social Media

"Like" Jacksonville District, U.S. Army Corps of Engineers on Facebook
https://www.facebook.com/JacksonvilleDistrict/
Follow us on Twitter @JaxStrong