FY-2025 Review Plans
FY-2024 Review Plans
WERP Integrated PIR and EIS Review Plan, October 2024
Central Everglades (New Water Phase) Validation Report Review Plan, September 2024
Key Biscayne Coastal Storm Risk Management Feasibility Study, September 2024
Fort Pierce, St. Lucie County Coastal Storm Risk Management Section 403 Letter Report Review Plan, August 2024
Biscayne Bay Coastal Wetlands Validation Study, Section 902 Limit Increase Request Report Review Plan, June 2024
FY-2023 Review Plans
Puerto Rico Coastal Storm Risk Management Project, Puerto Rico, April 2023
Indian River Lagoon-South Benefit and Cost Update Review Plan, June 2023
Saint Augustine Back Bay Coastal Storm Risk Management Feasibility Study, May 2023
FY-2022 Review Plans
Tampa Harbor General Reevaluation Report, May 2022
Indian River Lagoon - South, Section 902 Post-Authorization Change Report, Saint Lucie County, Florida, February 2022
Savan Gut Phase II Project, Saint Thomas, U.S. Virgin Islands, September 2021
FY-2021 Review Plans
Coastal Storm Risk Management (CSRM) Project, South Atlantic Coastal Study (SACS) March 8, 2021
Biscayne Bay and Southeastern Everglades Ecosystem Restoration (BBSEER), Miami-Dade County, Florida Project
Engineering Documentation Report of the C24 and C23 Stormwater Treatment Area, North Reservoir, and South Reservoir Projects, St. Lucie County, Florida October 29, 2020 (updated February 1, 2021)
Coastal Storm Risk Management (CSRM) Project, South Hutchinson Island Initial Construction, St. Lucie County, Florida, November 6, 2020
Broward County Water Preserve Area (BCWPA) C-11 Impoundment Project, Broward County, Florida​, October 16, 2020
St. Francis Barracks Seawall Project (CAP 14), St. Augustine, St. Johns County, Florida November 2, 2020
FY-2020 Review Plans
Rio Puerto Nuevo, Puerto Rico, Contracts 4 and 5B, September 14, 2020
Lake Worth Lagoon Project, Continuing Authorities Program, Palm Beach County, Florida, July 27, 2020
Rio Grande de Arecibo, Puerto Rico, June 23, 2020
Jacksonville Harbor Channel Deepening, Outer Channel Extension, June 19, 2020
Fort Pierce - Shore Protection Project - St. Lucie County, Florida, May 25, 2020
Segment III - Shore Protection Project - Broward County, Florida, May 19, 2020
Central Everglades Planning Project, Florida - L-67A Structures Spoil Mound Removal and L-67C Gapping, March 24, 2020
Central Everglades Planning Project, Florida - S-356 Pumping Station, March 24, 2020
Segment II - Shore Protection Project - Broward County, Florida, March 21, 2020
Dredge Material Management Area O-23 - Martin County, Florida, March 21, 2020
Indian River Lagoon South (IRLS) C-23/C-24 Stormwater Treatment Area Project, March 20, 2020
Rio Anton Ruiz Restoration Project, Humacao, Puerto Rico, Continuing Authorities Program, January 21, 2020
Lake Okeechobee System Operating Manual, December 18, 2019
Indian River Lagoon South (IRLS) C-24 North Reservoir Project, December 18, 2019
Conveyance Features of the Picayune Strand Restoration Project, December 18, 2019
Jacksonville Harbor Channel Deepening Contract C, November 19, 2019
Caloosahatchee River C-43 West Basin Storage Reservoir, October 31, 2019
Central Everglades Planning Project, Florida - Everglades Agricultural Area - A-2 Reservoir, October 31, 2019
Bal Harbour - Beach Erosion Control and Hurricane Protection Project - Miami-Dade County, Florida, October 28, 2019
Rio Puerto Nuevo Flood Control Contracts 2B, October 14, 2019
Rio Puerto Nuevo Flood Control Contracts 2C2 and 2C3, October 7, 2019
FY-2019 Review Plans
Rio Puerto Nuevo Flood Control Contracts 2D and 2E, September 30, 2019
Herbert Hoover Dike, S-71 and S-72 Embankment Armoring Project, September 17, 2019
Central Everglades Planning Project, Florida - Everglades Agricultural Area - Stormwater Treatment Area - Section 408 Permission Package, September 5, 2019
Anna Maria Island Beach Renourishment - Shore Protection Project - Manatee County, Florida, August 3, 2019
Biscayne Bay Coastal Wetlands - Contract 5 - Miami-Dade County, Florida, August 3, 2019
Rio Grande de Arecibo Flood Control Project, Validation Report Review Plan, July 6, 2019
Rio Puerto Nuevo, Supplemental Project, Hydrology and Hydraulic Products, July 7, 2019
Mid-Town Segment - Shore Protection Project - Palm Beach County, Florida, July 7, 2019
South Ponte Vedra and Vilano Beach Segments - Coastal Storm Risk Management Project - St. Johns County, Florida, July 7, 2019
Rio Puerto Nuevo Flood Control Project, Puerto Rico, July 6, 2019
Rio de la Plata Flood Control Project, Puerto Rico, June 21, 2019
Mid-Reach, South-Reach, and Patrick Air Force Base Segments - Shore Protection Project - Brevard County, Florida, July 2, 2019
Engineering Documentation Reports for Dune Resilience, Nassau, Duval, St. Johns, Brevard, Dade, Lee, Palm Beach, Sarasota, and Manatee Counties, Florida, June 21, 2019
Rio Grande de Arecibo, Supplemental Project, Hydrology and Hydraulic Products, June 21, 2019
Miami-Dade County Coastal Storm Risk Management Feasibility Study, May 31, 2019
Rio de la Plata, Flood Control Project, Hydrology and Hydraulic Products, Puerto Rico, May 22, 2019
Herbert Hoover Dike, State Road 78, Harney Pond Bridge Armoring Project, May 20, 2019
Pinellas County Coastal Storm Risk Management Feasibility Study, May 18, 2019
San Juan Harbor Channel Deepening and Widening Project, San Juan, Puerto Rico, May 17, 2019
Southwestern Protection Feature of the Picayune Strand Restoration Project, Collier County, Florida, May 13, 2019
Flagler County Shore Protection Project, April 20, 2019
Salud Creek, Emergency Streambank and Shoreline Protection Project, San German, Puerto Rico, Continuing Authorities Program, April 15, 2019
Loiza - Emergency Streambank and Shoreline Protection Project, Loiza, Puerto Rico, Continuing Authorities Program, April 12, 2019
Miami Harbor Improvements Study Review Plan, April 9, 2019
San Juan Metro Coastal Storm Risk Management Feasibility Study, April 5, 2019
Savan Gut Phase II, U.S. Virgin Islands, Rio Culebrinas, Puerto Rico, and Turpentine Run, U.S. Virgin Islands, Section 205 Flood Risk Management Study and EA Combined, Continuing Authorities Program (CAP) Conversion Feasibility Studies
Turpentine Run, U.S. Virgin Islands, Rio Culebrinas, Puerto Rico, and Savan Gut Phase II, U.S. Virgin Islands, Section 205 Flood Risk Management Study and EA Combined, Continuing Authorities Program (CAP) Conversion Feasibility Studies
Rio Culebrinas, Puerto Rico, Savan Gut Phase II, U.S. Virgin Islands, and Turpentine Run, U.S. Virgin Islands, Section 205 Flood Risk Management Study and EA Combined,, Continuing Authorities Program (CAP) Conversion Feasibility Studies
Biscayne Bay Coastal Wetlands L-31E Flow-way, January 19, 2017 Revised March 15, 2019
Sarasota County, Lido Key, 28 Oct 2013 Revised March 15, 2019
Central Everglades Planning Project Florida, South Components Validation Study, December 18, 2018 revised March 5, 2019
Big Fishweir Creek - Aquatic Ecosystem Restoration Project - Continuing Authorities Program, October 30, 2018
Mount Sinai Medical Center - Emergency Streambank and Shoreline Protection Project - Continuing Authorities Program, October 30, 2018
Indian River Lagoon South (IRLS) C-44 Intake Canal Bank Stabilization Project, October 30, 2018
Herbert Hoover Dike In-Place Abandonment of S-135 Bypass Culvert - Section 408 Permission Package, October 30, 2018
Guajataca Dam Stage 2 Risk Reduction Measures and Stage 3 Rehabilitation Project, Quebradillas, Puerto Rico
FY-2018 Review Plans
Final Independent External Peer Review Report, Central and Southern Florida Project, Comprehensive Everglades Restoration Plan, Lake Okeechobee Watershed Restoration Project (The Chief of Engineers's response to the independent panel's peer review report is currently under development, and will be posted and distributed within 10 days of completion and signature).
St. Johns County Shore Protection Beach Periodic Nourishment, October 26, 2017
2018 L-29 Canal and G-3273 Constraint Relaxations and 2019 System Operating Manual Update, November 2, 2017
Fort Pierce Shore Protection Beach Periodic Nourishment, December 19, 2017
Kissimmee River - Lake Istokpoga Basin System Operating Manual, December 19, 2017
Tampa Harbor - Big Bend Channel, January 12, 2018
Lake Okeechobee Watershed Restoration Plan, February 21, 2018
Lake Okeechobee Watershed Restoration Plan Revised, September 14, 2018
Herbert Hoover Dike Dam Modification Cutoff Wall Projects, March 20, 2018
Caloosahatchee River (C-43) West Basin Storage Reservoir Project, Design Package 4, March 22, 2018
Indian River Lagoon South - Reservoir/Stormwater Treatment Area - Project Operating Manual, April 15, 2018
S-333N Gated Spillway, June 15, 2018
S-333N Gated Spillway - Section 408 Permission Package, June 15, 2018
FY-2017 Review Plans
Loxahatchee River Watershed Restoration, October 28, 2016
Biscayne Bay Coastal Wetlands L-31E Flow-way, January 19, 2017 (Revised FY2019)
Broward County Water Preserve Area Northern Mitigation Area A Berm, January 19, 2017
Lee County Gasparilla 934 Review Plan, January 19, 2017
Herbert Hoover Dike Water Control Structures, March 15, 2017
Sunny Isles Shore Protection Beach Renourishment, April 18, 2017
Fort Jackson Upper Legion Dam Repair, Lower Legion Dike Repair, and Twin Dam Removal, April 27, 2017
SAD Approval Memo+RP DPM Operational Strategy Extension June 2017 Redacted
Palm Beach Harbor Maintenance Dredging, July 26, 2017
Rio de la Plata Flood Control Dorado Bridge Channel Widening, July 26, 2017
Brevard County Shore Protection North and South Reaches Periodic Nourishment, August 2, 2017
Martin County Shore Protection Hutchinson Island Periodic Nourishment, August 2, 2017
Pinellas County Shore Protection Project 2017 Beach Periodic Nourishment, Sand Key, Treasure Island and Long Key Segment, August 16, 2017
Western Everglades Restoration Plan September 6, 2017
FY-2016 Review Plans
St. Johns County, Florida Hurricane and Storm Damage Reduction (HSDR) Feasibility Study and Environmental Assessment, Jan 25, 2016
San Juan Harbor Improvement Study, April 1, 2016
C-111 Contract 8A EDR, Review Plan and Approval Memo, March 2, 2016
C-43 Design Package S-476, Feb 10, 2016
Cano Martin Pena Review Plan, April 25, 2016
Duval SPP Review Plan and Approval Memo, April 7, 2016
HHD Gap Reach 1 Gap Closure Review Plan and Approval memo, Jan 15, 2016
HHD Reach 1 Cutoff Wall Extension Review Plan and Approval memo, May 2, 2016
Lake Hicpochee 408 Package Review Plan and Approval memo, May 3, 2016
Miami Dade Hot Spots Review Plan and Approval memo, May 2, 2016
Okeechobee Waterway DMMA O-7 Review Plan and Approval memo, May 3, 2016
S-169 and C-20 Package Review Plan and Approval Memo, Feb 19, 2016
C-111 Central and Southern Florida Contract 8A, June 15, 2016
Kissimmee River Restoration C-37 Embankment Armoring, June 15, 2016
Port Everglades Navigation Improvements, June 15, 2016
Broward County Water Preserve Area 26th Street Culverts, July 26, 2016
Caloosahatchee River (C-43) West Basin Storage Reservoir S-470 Pump Station and Inflow Works, July 26, 2016
Biscayne Bay Coastal Wetlands L-31E Flow-way, Culverts S-712A and S-712B, August 15, 2016
Rio Puerto Nuevo Flood Control Contract 2D, August 15, 2016
Jacksonville Harbor Channel Deepening Contract B, September 29, 2016
FY-2015 Review Plans
8.5 Square Mile, S-357N, 8 December 2014
Brevard County Mid-Reach Mitigation RP and Approval Memo 03-Apr-2015
Broward County Segment II RP and Approval Memo 3-Apr-2015
C-111 Project Modifications to the C&SF Project Contract 8 Miami-Dade 11-May-2015
C-43 SFWMD Design Package 1 Preloading Demolition 6-Jul-2015_Redacted
C&SF Project, Changes to Structure 190 Operational Criteria, Master Water Control Manual
(Water Conservation Areas, Everglades National Park, and ENP-South Dade Conveyance System)
-Review Plan, 14 Jan 2015
-Approval, 04 Feb 2015
Continuing Authorities Program, South Atlantic Division Programmatic Review Plan, 9 Apr 2015
-Enclosure A, Review Plan Template (MS_Word)
-Enclosure B, IEPR Decision Analysis/Regional CAP Review Plan Applicability Determination (MS_Word)
G-3273 Contraint Relaxation/S-356 and S357N Field Test, October 2014
G-3273 Contraint Relaxation Approval Memo, 24 November 2014
Herbert Hoover Dike 2015 Major Rehabilitation Report Supplement and Environmental Assessment
Herbert Hoover Dike Dam Safety Modification Report and Environmental Assessment, 17 September 2015
Jacksonville Harbor Deepening, PED Documents, 15 December 2014
KRR CNT 12A S-69 Weir RP and Approval Memo, 24-August-2015
Picayune Strand, Approval of RP for Manatee Mitigation Feature, 11 February 2015
Rio Culebrinas, Flood Risk Management, Sec 205, plan and approval 18 Mar 2015
Rio de la Plata, Flood Risk Management, 9 Apr 2015
San Juan Harbor Mitigation, Approval of RP, 02 May 2015
Seminole Big Cypress Basin 3 EDR RP and Approval Memo 3-Apr-2015
St. Johns County, Florida, Coastal Storm Risk Management Project Validation Study, 10 Aug 2015
St. Lucie River Oyster Reef Estuary Habitat Restoration, Phase II, 12 Jan 2015
Upper St. Johns, S252, Deficiencies Report, 24 November 2014
FY-2014 Review Plans
Aquifer Storage and Recovery Regional Study Technical Data Report, 3 Jun 2014
Canaveral Harbor Widening and Deepening, 13 November 2013
Grassy Flats Estuarine Habitat Restoration Project, 17 Jun 2014
Kissimmee River Restoration, LRR, Revised Review Plan, July 2014
Portugues Dam, Approval of Revised RP, 19 May 2014
Sarasota County, Lido Key, 28 Oct 2013 (Revised FY2019)
Sarasota County, Venice Beach, 24 June 2014
Seminole Big Cypress Reservation, Water Control Manual, Basins 1, 2, and 4
Seminole Big Cypress Reservation, WCM, Basins 1, 2, and 4 approval, 25 Nov 2013
STA-1E Gates Deficiencies Modification Report, Review Plan, 18 July 2014
FY-2013 Review Plans
Banana River Estuary Restoration Project
Banana River Estuary Restoration Project, Approval Memo, 29 April 2013
Brevard County, North and South Reach, FCCE, 23 August 2013
Broward County, Segment 2, LRR
Broward County, Segment 2, Approval Memo
Broward County (Segment II), Florida FCCE Review Plan
Cano Martin Pena
Cano Martin Pena Approval Memo
Dade County Beach Erosion Control and Hurricane Protection, LRR
Dade County Beach Erosion Control and Hurricane Protection, LRR Approval Memo
Dade County Beach Erosion Control LRR, Revised Review Plan
Dade County Beach Erosion Control, Approval of RP for Periodic Renourishment, 26 November 2012
FCCE Approval of RP, Manatee SP, Gasparilla Island, Lee County, 12 August 2013
FCCE Approval of RP, Jupiter/Carlin, Ocean Ridge, Delray Beach and North Boca of Palm Beach County, 12 August 2013
Fort Pierce Beach Shore Protection Project Review Plan
Indian River Lagoon South (IRLS) C-44 Review Plan 17-DEC-2012
Jacksonville Harbor General Reevaluation Report (GRR2)
Jacksonville Harbor O&M, Dredged Material Management Plan
Kissimmee River Restoration Project, Contract 15A, River Acres Supplemental Work, 25 March 2013
Lake Worth Inlet, Palm Beach Harbor, Feasibility Study
Lake Worth Inlet, Palm Beach Harbor, Approval Memo
Lower Hillsborough and Tampa Bypass Canal Master Water Control Manual
Lower Hillsborough and Tampa Bypass Canal MWCP Approval Memo
Manatee County LRR
Manatee County LRR Approval Memo
Modified Water Deliveries, Letter Report to Assess Competion Satus
Modified Water Deliveries, Letter Report Approval Memo, 12 April 2013
Palm Beach County, Jupiter Carlin, Section 934 Study
Palm Beach County, Jupiter Carlin Approval Memo
Palm Beach County, Ocean Ridge LRR
Palm Beach County, Ocean Ridge Approval Memo
Picayune Strand PAC LRR
Picayune Strand Approval Memo
Pinellas and Lee County Hurricane and Storm Damage Reduction Review Plans, 13 June 2013
Port Everglades Feasibility Study Review Plan Second Update, 23 Jan 2012
Programmatic Review Plan for Routine O&M Products
Rio Puerto Nuevo, PR, Review Plan, 14 December 2012
Rio Grande de Arecibo, Post Authorization Change Report
Rio Grande de Arecibo, PACR, Approval Memo, 2 May 2013
Rio Puerto Nuevo, Post Authorization Change Report
Rio Puerto Nuevo, PAC, Approval Memo, 17 May 2013
San Juan Harbor LRR, Mitigation
San Juan Harbor LRR, Review Plan Approval, 30 May 2013
Seminole Big Cypress Reservation, Water Control Plan and EA, 1 Oct 12
Seminole Big Cypress Reservation, Water Control Plan, Approval Memo
Stormwater Treatment Area STA 1E (C&SF: West Palm Beach Canal C-51) Letter Report
Stormwater Treatment Area STA 1E Approval Memo, 8 Apr 2013
Stormwater Treatment Area STA 1E, RP for Everglades Restoration Strategies, L-8 Flow and S-375 Expansion, 8 May 2013
FY-2012 Review Plans
Broward County Water Preserve Area
Broward County Water Preserve Area Approval Memo
C-111 South Dade, Contract 8, 9 Jan 2012
Canaveral Harbor Sec 203
Canaveral Harbor Sec 203 Approval Memo
Cedar Hammock (Wares Creek), 30 April 2012
Central Everglades Planning Project
Central Everglades Planning Project Approval Memo
Dade County SMART Structures
Everglades Restoration Transition Plan, Revisions to Water Control Plan (ENP) and EIS
Herbert Hoover Dike, Design and Construction, 2nd Revision, 10 May 2012
Herbert Hoover Dike, Pilot Test Letter Report, Plans and Specs, 23 April 2012
Jacksonville Harbor, Mile Point, PED Phase, 27 July 2012
Kissimmee River Restoration, Contract 10, PED Phase
Lake Okeechobee Aquifer Storage and Recovery (ASR) Pilot Project Review Plan, 19 March 2012
Martin County Shore Protection, Periodic Renourishment Implementation Docs, 19 March 2012
Sarasota County, Venice Beach, LRR
Southwest Florida Feasibility Study, 16 Nov 2011
STA-1E, PSTA Decommissioning Project and EA, Dec 2011
Tarpon Springs, Whitcomb and Kreamer Bayous, CAP 103, 9 January 2012
Upper St. Johns River Three Forks Marsh Conservation Review Plan, 21 May 2012
Water Control Area 3 Decompartmentalization Physical Model Approval
FY-2011 Review Plans
8.5 Square Mile Area Project, Interim Operating Criteria and EA, 24 June 2011
Big Fishweir Creek, CAP Section 206
Duval County Beach Erosion Control, Periodic Renourishment Implementation Docs, 9 November 2010
Everglades Restoration Plan
Ft. Pierce Beach Shore Protection, Implementation Documents, 1 June 2011
Kissimmee River Restoration Project, Contract 12, S-65EX1 Structure, Intermediate Phase, P&S and DDR, 30 August 2011
Kissimmee River Restoration, C-38 Reach 3 Backfill and Bass Levee Degrade, PED
Kissimmee River Restoration, Limited Reevaluation Report (LRR)
Martin County Shore Protection Review Plan
Martin County Shore Protection Review Plan Approval
Martin County Shore Protection Type 1 IEPR Exclusion
Miami Harbor Deepening & Widening (PhaseIII), 15 August 2011
Picayune Strand Restoration, Design and Construction Phases, 8 August 2011
Pinellas County, Beach Erosion Control, 17 May 2011
Regional O&M Review Plan
Seminole Big Cypress Reservation, Interim Water Control Plan and EA
St. Johns County Shore Protection, Periodic Renourishment Implementation Documents
STA-1E Modifications, Culverts and Trash Rake Systems, Decision Doument
STA-1E Modifications, Culverts and Trash Rake Systems, 18 August 2011
STA-1E Modifications, Culverts and Trash Rake Systems, Review Plan Approval
STA-1E Modifications, Culverts and Trash Rake Systems, IEPR Exclusion
Tampa Harbor GRR
Tampa Harbor Dredged Material Management Plan, 2010-2030 Update
FY-2010 Review Plans
Broward County, Segment 1, Shore Protection
Flagler County Shore Protection Feasibility Study
Kissimmee River Restoration Post-Authorization Change, LRR
Port Everglades Feasibility Study, May 2010 Update
Rio de la Plata, Flood Control
St. Johns County Feasibility Study, May 2010 Update
WCA 3A Decompartmentalization
Site 1 Impoundment - Fran Reich Preserve Review Plan, 4 Feb 2010
FY-2009 Review Plans
Biscayne Bay Coastal Wetlands
C-111 Spreader Canal
Ft. Pierce, St. Lucie County, Shore Protection, GRR
St. Lucie Hurricane and Storm Damage Reduction Feasibility Study and EIS
FY-2008 Review Plans
Brevard County Shore Protection Mid Reach GRR
Flagler County Hurricane and Storm Damage Reduction, Feasibility 17 Mar 2008
Indian River Lagoon North (IRL-N) Feasibility Study
Jacksonville Harbor GRR, Phase 2
Jacksonville Harbor, Mile Point Feasibility Study
Port Everglades Feasibility Study
St. Johns County Feasibility Study