Review Plans

Collapse All Expand All
 Review Plans

FY-2023 Review Plans 

 Puerto Rico Coastal Storm Risk Management Project, Puerto Rico, April 2023

Indian River Lagoon-South Benefit and Cost Update Review Plan, June 2023

Saint Augustine Back Bay Coastal Storm Risk Management Feasibility Study, May 2023 

FY-2022 Review Plans

Tampa Harbor General Reevaluation Report, May 2022

Indian River Lagoon - South, Section 902 Post-Authorization Change Report, Saint Lucie County, Florida, February 2022

Savan Gut Phase II Project, Saint Thomas, U.S. Virgin Islands, September 2021

FY-2021 Review Plans

Coastal Storm Risk Management (CSRM) Project,  South Atlantic Coastal Study (SACS) March 8, 2021

Biscayne Bay and Southeastern Everglades Ecosystem Restoration (BBSEER), Miami-Dade County, Florida Project

Engineering Documentation Report of the C24 and C23 Stormwater Treatment Area, North Reservoir, and South Reservoir Projects, St. Lucie County, Florida October 29, 2020 (updated February 1, 2021)

Coastal Storm Risk Management (CSRM) Project, South Hutchinson Island Initial Construction, St. Lucie County, Florida, November 6, 2020

Broward County Water Preserve Area (BCWPA) C-11 Impoundment Project, Broward County, Florida​, October 16, 2020

St. Francis Barracks Seawall Project (CAP 14), St. Augustine, St. Johns County, Florida November 2, 2020

FY-2020 Review Plans

Rio Puerto Nuevo, Puerto Rico, Contracts 4 and 5B, September 14, 2020

Lake Worth Lagoon Project, Continuing Authorities Program, Palm Beach County, Florida, July 27, 2020

Rio Grande de Arecibo, Puerto Rico, June 23, 2020

Jacksonville Harbor Channel Deepening, Outer Channel Extension, June 19, 2020

Fort Pierce - Shore Protection Project - St. Lucie County, Florida, May 25, 2020

Segment III - Shore Protection Project - Broward County, Florida, May 19, 2020

Central Everglades Planning Project, Florida - L-67A Structures Spoil Mound Removal and L-67C Gapping, March 24, 2020

Central Everglades Planning Project, Florida - S-356 Pumping Station, March 24, 2020

Segment II - Shore Protection Project - Broward County, Florida, March 21, 2020

Dredge Material Management Area O-23 - Martin County, Florida, March 21, 2020

Indian River Lagoon South (IRLS) C-23/C-24 Stormwater Treatment Area Project, March 20, 2020

Rio Anton Ruiz Restoration Project, Humacao, Puerto Rico, Continuing Authorities Program, January 21, 2020

Lake Okeechobee System Operating Manual, December 18, 2019

Indian River Lagoon South (IRLS) C-24 North Reservoir Project, December 18, 2019

Conveyance Features of the Picayune Strand Restoration Project, December 18, 2019

Jacksonville Harbor Channel Deepening Contract C, November 19, 2019

Caloosahatchee River C-43 West Basin Storage Reservoir, October 31, 2019 

Central Everglades Planning Project, Florida - Everglades Agricultural Area - A-2 Reservoir, October 31, 2019

Bal Harbour - Beach Erosion Control and Hurricane Protection Project - Miami-Dade County, Florida, October 28, 2019

Rio Puerto Nuevo Flood Control Contracts 2B, October 14, 2019

Rio Puerto Nuevo Flood Control Contracts 2C2 and 2C3, October 7, 2019

FY-2019 Review Plans

Rio Puerto Nuevo Flood Control Contracts 2D and 2E, September 30, 2019

Herbert Hoover Dike, S-71 and S-72 Embankment Armoring Project, September 17, 2019

Central Everglades Planning Project, Florida - Everglades Agricultural Area - Stormwater Treatment Area - Section 408 Permission Package, September 5, 2019

Anna Maria Island Beach Renourishment - Shore Protection Project - Manatee County, Florida, August 3, 2019

Biscayne Bay Coastal Wetlands - Contract 5 - Miami-Dade County, Florida, August 3, 2019

Rio Grande de Arecibo Flood Control Project, Validation Report Review Plan, July 6, 2019 

Rio Puerto Nuevo, Supplemental Project, Hydrology and Hydraulic Products, July 7, 2019

Mid-Town Segment - Shore Protection Project - Palm Beach County, Florida, July 7, 2019

South Ponte Vedra and Vilano Beach Segments - Coastal Storm Risk Management Project - St. Johns County, Florida, July 7, 2019

Rio Puerto Nuevo Flood Control Project, Puerto Rico, July 6, 2019

Rio de la Plata Flood Control Project, Puerto Rico, June 21, 2019 

Mid-Reach, South-Reach, and Patrick Air Force Base Segments - Shore Protection Project - Brevard County, Florida, July 2, 2019

Engineering Documentation Reports for Dune Resilience, Nassau, Duval, St. Johns, Brevard, Dade, Lee, Palm Beach, Sarasota, and Manatee Counties, Florida, June 21, 2019

Rio Grande de Arecibo, Supplemental Project, Hydrology and Hydraulic Products, June 21, 2019

Miami-Dade County Coastal Storm Risk Management Feasibility Study, May 31, 2019 

Rio de la Plata, Flood Control Project, Hydrology and Hydraulic Products, Puerto Rico, May 22, 2019

Herbert Hoover Dike, State Road 78, Harney Pond Bridge Armoring Project, May 20, 2019

Pinellas County Coastal Storm Risk Management Feasibility Study, May 18, 2019 

San Juan Harbor Channel Deepening and Widening Project, San Juan, Puerto Rico, May 17, 2019

Southwestern Protection Feature of the Picayune Strand Restoration Project, Collier County, Florida, May 13, 2019

Flagler County Shore Protection Project, April 20, 2019

Salud Creek, Emergency Streambank and Shoreline Protection Project, San German, Puerto Rico, Continuing Authorities Program, April 15, 2019

Loiza - Emergency Streambank and Shoreline Protection Project, Loiza, Puerto Rico, Continuing Authorities Program, April 12, 2019

Miami Harbor Improvements Study Review Plan, April 9, 2019

San Juan Metro Coastal Storm Risk Management Feasibility Study, April 5, 2019

Savan Gut Phase II, U.S.  Virgin Islands, Rio Culebrinas, Puerto Rico, and Turpentine Run, U.S. Virgin Islands, Section 205 Flood Risk Management Study and EA Combined, Continuing Authorities Program (CAP) Conversion Feasibility Studies 

Turpentine Run, U.S.  Virgin Islands, Rio Culebrinas, Puerto Rico, and Savan Gut Phase II, U.S. Virgin Islands, Section 205 Flood Risk Management Study and EA Combined, Continuing Authorities Program (CAP) Conversion Feasibility Studies 

Rio Culebrinas, Puerto Rico, Savan Gut Phase II, U.S. Virgin Islands, and Turpentine Run, U.S. Virgin Islands, Section 205 Flood Risk Management Study and EA Combined,, Continuing Authorities Program (CAP) Conversion Feasibility Studies 

Biscayne Bay Coastal Wetlands L-31E Flow-way, January 19, 2017 Revised March 15, 2019

Sarasota County, Lido Key, 28 Oct 2013 Revised March 15, 2019

Central Everglades Planning Project Florida, South Components Validation Study, December 18, 2018 revised March 5, 2019

Big Fishweir Creek - Aquatic Ecosystem Restoration Project - Continuing Authorities Program, October 30, 2018

Mount Sinai Medical Center - Emergency Streambank and Shoreline Protection Project - Continuing Authorities Program, October 30, 2018

Indian River Lagoon South (IRLS) C-44 Intake Canal Bank Stabilization Project, October 30, 2018

Herbert Hoover Dike In-Place Abandonment of S-135 Bypass Culvert - Section 408 Permission Package, October 30, 2018

Guajataca Dam Stage 2 Risk Reduction Measures and Stage 3 Rehabilitation Project, Quebradillas, Puerto Rico


FY-2018 Review Plans

Final Independent External Peer Review Report, Central and Southern Florida Project, Comprehensive Everglades Restoration Plan, Lake Okeechobee Watershed Restoration Project  (The Chief of Engineers's response to the independent panel's peer review report is currently under development, and will be posted and distributed within 10 days of completion and signature).    

St. Johns County Shore Protection Beach Periodic Nourishment, October 26, 2017

2018 L-29 Canal and G-3273 Constraint Relaxations and 2019 System Operating Manual Update, November 2, 2017

Fort Pierce Shore Protection Beach Periodic Nourishment, December 19, 2017

Kissimmee River - Lake Istokpoga Basin System Operating Manual, December 19, 2017

Tampa Harbor - Big Bend Channel, January 12, 2018

Lake Okeechobee Watershed Restoration Plan, February 21, 2018

Lake Okeechobee Watershed Restoration Plan Revised, September 14, 2018

Herbert Hoover Dike Dam Modification Cutoff Wall Projects, March 20, 2018

Caloosahatchee River (C-43) West Basin Storage Reservoir Project, Design Package 4, March 22, 2018

Indian River Lagoon South - Reservoir/Stormwater Treatment Area - Project Operating Manual, April 15, 2018

S-333N Gated Spillway, June 15, 2018

S-333N Gated Spillway - Section 408 Permission Package, June 15, 2018


FY-2017 Review Plans

Loxahatchee River Watershed Restoration, October 28, 2016

Biscayne Bay Coastal Wetlands L-31E Flow-way, January 19, 2017 (Revised FY2019)

Broward County Water Preserve Area Northern Mitigation Area A Berm, January 19, 2017

Lee County Gasparilla 934 Review Plan, January 19, 2017

Herbert Hoover Dike Water Control Structures, March 15, 2017

Sunny Isles Shore Protection Beach Renourishment, April 18, 2017

Fort Jackson Upper Legion Dam Repair, Lower Legion Dike Repair, and Twin Dam Removal, April 27, 2017

SAD Approval Memo+RP DPM Operational Strategy Extension June 2017 Redacted

Palm Beach Harbor Maintenance Dredging, July 26, 2017

Rio de la Plata Flood Control Dorado Bridge Channel Widening, July 26, 2017

Brevard County Shore Protection North and South Reaches Periodic Nourishment, August 2, 2017

Martin County Shore Protection Hutchinson Island Periodic Nourishment, August 2, 2017

Pinellas County Shore Protection Project 2017 Beach Periodic Nourishment, Sand Key, Treasure Island and Long Key Segment, August 16, 2017

Western Everglades Restoration Plan September 6, 2017


FY-2016 Review Plans

St. Johns County, Florida Hurricane and Storm Damage Reduction (HSDR) Feasibility Study and Environmental Assessment, Jan 25, 2016

San Juan Harbor Improvement Study, April 1, 2016

C-111 Contract 8A EDR, Review Plan and Approval Memo, March 2, 2016

C-43 Design Package S-476, Feb 10, 2016

Cano Martin Pena Review Plan, April 25, 2016

Duval SPP Review Plan and Approval Memo, April 7, 2016

HHD Gap Reach 1 Gap Closure Review Plan and Approval memo, Jan 15, 2016

HHD Reach 1 Cutoff Wall Extension Review Plan and Approval memo, May 2, 2016

Lake Hicpochee 408 Package Review Plan and Approval memo, May 3, 2016

Miami Dade Hot Spots Review Plan and Approval memo, May 2, 2016

Okeechobee Waterway DMMA O-7 Review Plan and Approval memo, May 3, 2016

S-169 and C-20 Package Review Plan and Approval Memo, Feb 19, 2016
 

C-111 Central and Southern Florida Contract 8A, June 15, 2016

Kissimmee River Restoration C-37 Embankment Armoring, June 15, 2016

Port Everglades Navigation Improvements, June 15, 2016

Broward County Water Preserve Area 26th Street Culverts, July 26, 2016

Caloosahatchee River (C-43) West Basin Storage Reservoir S-470 Pump Station and Inflow Works, July 26, 2016

Biscayne Bay Coastal Wetlands L-31E Flow-way, Culverts S-712A and S-712B, August 15, 2016

Rio Puerto Nuevo Flood Control Contract 2D, August 15, 2016

Jacksonville Harbor Channel Deepening Contract B, September 29, 2016


FY-2015 Review Plans

8.5 Square Mile, S-357N, 8 December 2014

Brevard County Mid-Reach Mitigation RP and Approval Memo 03-Apr-2015

Broward County Segment II RP and Approval Memo 3-Apr-2015

C-111 Project Modifications to the C&SF Project Contract 8 Miami-Dade 11-May-2015

C-43 SFWMD Design Package 1 Preloading Demolition 6-Jul-2015_Redacted

C&SF Project, Changes to Structure 190 Operational Criteria, Master Water Control Manual

(Water Conservation Areas, Everglades National Park, and ENP-South Dade Conveyance System)

-Review Plan, 14 Jan 2015

-Approval, 04 Feb 2015

Continuing Authorities Program, South Atlantic Division Programmatic Review Plan, 9 Apr 2015

-Enclosure A, Review Plan Template (MS_Word)

-Enclosure B, IEPR Decision Analysis/Regional CAP Review Plan Applicability Determination (MS_Word)

G-3273 Contraint Relaxation/S-356 and S357N Field Test, October 2014

G-3273 Contraint Relaxation Approval Memo, 24 November 2014

Herbert Hoover Dike 2015 Major Rehabilitation Report Supplement and Environmental Assessment

Herbert Hoover Dike Dam Safety Modification Report and Environmental Assessment, 17 September 2015

Jacksonville Harbor Deepening, PED Documents, 15 December 2014

KRR CNT 12A S-69 Weir RP and Approval Memo, 24-August-2015

Picayune Strand, Approval of RP for Manatee Mitigation Feature, 11 February 2015

Rio Culebrinas, Flood Risk Management, Sec 205, plan and approval 18 Mar 2015

Rio de la Plata, Flood Risk Management, 9 Apr 2015

San Juan Harbor Mitigation, Approval of RP, 02 May 2015

Seminole Big Cypress Basin 3 EDR RP and Approval Memo 3-Apr-2015

St. Johns County, Florida, Coastal Storm Risk Management Project Validation Study, 10 Aug 2015

St. Lucie River Oyster Reef Estuary Habitat Restoration, Phase II, 12 Jan 2015

Upper St. Johns, S252, Deficiencies Report, 24 November 2014

FY-2014 Review Plans

Aquifer Storage and Recovery Regional Study Technical Data Report, 3 Jun 2014

Canaveral Harbor Widening and Deepening, 13 November 2013

Grassy Flats Estuarine Habitat Restoration Project, 17 Jun 2014

Kissimmee River Restoration, LRR, Revised Review Plan, July 2014

Portugues Dam, Approval of Revised RP, 19 May 2014

Sarasota County, Lido Key, 28 Oct 2013 (Revised FY2019)

Sarasota County, Venice Beach, 24 June 2014

Seminole Big Cypress Reservation, Water Control Manual, Basins 1, 2, and 4

Seminole Big Cypress Reservation, WCM, Basins 1, 2, and 4 approval, 25 Nov 2013

STA-1E Gates Deficiencies Modification Report, Review Plan, 18 July 2014

 

FY-2013 Review Plans

Banana River Estuary Restoration Project

Banana River Estuary Restoration Project, Approval Memo, 29 April 2013

Brevard County, North and South Reach, FCCE, 23 August 2013

Broward County, Segment 2, LRR

Broward County, Segment 2, Approval Memo

Broward County (Segment II), Florida FCCE Review Plan

Cano Martin Pena

Cano Martin Pena Approval Memo

Dade County Beach Erosion Control and Hurricane Protection, LRR

Dade County Beach Erosion Control and Hurricane Protection, LRR Approval Memo

Dade County Beach Erosion Control LRR, Revised Review Plan

Dade County Beach Erosion Control, Approval of RP for Periodic Renourishment, 26 November 2012

FCCE Approval of RP, Manatee SP, Gasparilla Island, Lee County, 12 August 2013

FCCE Approval of RP, Jupiter/Carlin, Ocean Ridge, Delray Beach and North Boca of Palm Beach County, 12 August 2013

Fort Pierce Beach Shore Protection Project Review Plan

Indian River Lagoon South (IRLS) C-44 Review Plan 17-DEC-2012

Jacksonville Harbor General Reevaluation Report (GRR2)

Jacksonville Harbor O&M, Dredged Material Management Plan

Kissimmee River Restoration Project, Contract 15A, River Acres Supplemental Work, 25 March 2013

Lake Worth Inlet, Palm Beach Harbor, Feasibility Study

Lake Worth Inlet, Palm Beach Harbor, Approval Memo

Lower Hillsborough and Tampa Bypass Canal Master Water Control Manual

Lower Hillsborough and Tampa Bypass Canal MWCP Approval Memo

Manatee County LRR

Manatee County LRR Approval Memo

Modified Water Deliveries, Letter Report to Assess Competion Satus

Modified Water Deliveries, Letter Report Approval Memo, 12 April 2013

Palm Beach County, Jupiter Carlin, Section 934 Study

Palm Beach County, Jupiter Carlin Approval Memo

Palm Beach County, Ocean Ridge LRR

Palm Beach County, Ocean Ridge Approval Memo

Picayune Strand PAC LRR

Picayune Strand Approval Memo

Pinellas and Lee County Hurricane and Storm Damage Reduction Review Plans, 13 June 2013

Port Everglades Feasibility Study Review Plan Second Update, 23 Jan 2012

Programmatic Review Plan for Routine O&M Products

Rio Puerto Nuevo, PR, Review Plan, 14 December 2012

Rio Grande de Arecibo, Post Authorization Change Report

Rio Grande de Arecibo, PACR, Approval Memo, 2 May 2013

Rio Puerto Nuevo, Post Authorization Change Report

Rio Puerto Nuevo, PAC, Approval Memo, 17 May 2013

San Juan Harbor LRR, Mitigation

San Juan Harbor LRR, Review Plan Approval, 30 May 2013

Seminole Big Cypress Reservation, Water Control Plan and EA, 1 Oct 12

Seminole Big Cypress Reservation, Water Control Plan, Approval Memo

Stormwater Treatment Area STA 1E (C&SF: West Palm Beach Canal C-51) Letter Report

Stormwater Treatment Area STA 1E Approval Memo, 8 Apr 2013

Stormwater Treatment Area STA 1E, RP for Everglades Restoration Strategies, L-8 Flow and S-375 Expansion, 8 May 2013

FY-2012 Review Plans

Broward County Water Preserve Area

Broward County Water Preserve Area Approval Memo

C-111 South Dade, Contract 8, 9 Jan 2012

Canaveral Harbor Sec 203

Canaveral Harbor Sec 203 Approval Memo

Cedar Hammock (Wares Creek), 30 April 2012

Central Everglades Planning Project

Central Everglades Planning Project Approval Memo

Dade County SMART Structures

Everglades Restoration Transition Plan, Revisions to Water Control Plan (ENP) and EIS

Herbert Hoover Dike, Design and Construction, 2nd Revision, 10 May 2012

Herbert Hoover Dike, Pilot Test Letter Report, Plans and Specs, 23 April 2012

Jacksonville Harbor, Mile Point, PED Phase, 27 July 2012

Kissimmee River Restoration, Contract 10, PED Phase

Lake Okeechobee Aquifer Storage and Recovery (ASR) Pilot Project Review Plan, 19 March 2012

Martin County Shore Protection, Periodic Renourishment Implementation Docs, 19 March 2012

Sarasota County, Venice Beach, LRR

Southwest Florida Feasibility Study, 16 Nov 2011

STA-1E, PSTA Decommissioning Project and EA, Dec 2011

Tarpon Springs, Whitcomb and Kreamer Bayous, CAP 103, 9 January 2012

Upper St. Johns River Three Forks Marsh Conservation Review Plan, 21 May 2012

Water Control Area 3 Decompartmentalization Physical Model Approval

FY-2011 Review Plans

8.5 Square Mile Area Project, Interim Operating Criteria and EA, 24 June 2011

Big Fishweir Creek, CAP Section 206

Duval County Beach Erosion Control, Periodic Renourishment Implementation Docs, 9 November 2010

Everglades Restoration Plan

Ft. Pierce Beach Shore Protection, Implementation Documents, 1 June 2011

Kissimmee River Restoration Project, Contract 12, S-65EX1 Structure, Intermediate Phase, P&S and DDR, 30 August 2011

Kissimmee River Restoration, C-38 Reach 3 Backfill and Bass Levee Degrade, PED

Kissimmee River Restoration, Limited Reevaluation Report (LRR)

Martin County Shore Protection Review Plan

Martin County Shore Protection Review Plan Approval

Martin County Shore Protection Type 1 IEPR Exclusion

Miami Harbor Deepening & Widening (PhaseIII), 15 August 2011

Picayune Strand Restoration, Design and Construction Phases, 8 August 2011

Pinellas County, Beach Erosion Control, 17 May 2011

Regional O&M Review Plan

Seminole Big Cypress Reservation, Interim Water Control Plan and EA

St. Johns County Shore Protection, Periodic Renourishment Implementation Documents

STA-1E Modifications, Culverts and Trash Rake Systems, Decision Doument

STA-1E Modifications, Culverts and Trash Rake Systems, 18 August 2011

STA-1E Modifications, Culverts and Trash Rake Systems, Review Plan Approval

STA-1E Modifications, Culverts and Trash Rake Systems, IEPR Exclusion

Tampa Harbor GRR

Tampa Harbor Dredged Material Management Plan, 2010-2030 Update



FY-2010 Review Plans

Broward County, Segment 1, Shore Protection

Flagler County Shore Protection Feasibility Study

Kissimmee River Restoration Post-Authorization Change, LRR

Port Everglades Feasibility Study, May 2010 Update

Rio de la Plata, Flood Control

St. Johns County Feasibility Study, May 2010 Update

WCA 3A Decompartmentalization

Site 1 Impoundment - Fran Reich Preserve Review Plan, 4 Feb 2010

FY-2009 Review Plans

Biscayne Bay Coastal Wetlands

C-111 Spreader Canal

Ft. Pierce, St. Lucie County, Shore Protection, GRR

St. Lucie Hurricane and Storm Damage Reduction Feasibility Study and EIS

FY-2008 Review Plans

Brevard County Shore Protection Mid Reach GRR

Flagler County Hurricane and Storm Damage Reduction, Feasibility 17 Mar 2008

Indian River Lagoon North (IRL-N) Feasibility Study

Jacksonville Harbor GRR, Phase 2

Jacksonville Harbor, Mile Point Feasibility Study

Port Everglades Feasibility Study

St. Johns County Feasibility Study