Public Notice Notifications

The Jacksonville District currently has five categories of public notice notification mailing lists. If you wish to receive email notifications when new public notices are added to this page, please send a request to Regulatory Webmaster.  Each category is described below. Be sure to specify which list(s) you want to be included on.

Florida - This includes all public notices for projects being reviewed for Standard Permits within the State of Florida.

Antilles - This includes all public notices for projects being reviewed for Standard Permits within the Antilles area (this includes Puerto Rico and the US Virgin Islands).

Tropical Storms & Other Emergencies - These public notices provide information on procedures for emergency permitting requirements due to specific tropical storm events or other emergency situations.

Special Issues - These are public notices that involve the Regulatory program but which are generally not limited to one particular geographic area. These would include public notices for the establishment or modification of Restricted Areas/Danger Zones, re-issuance of General Permits or Nationwide Permits, changes to guidance and policies, etc.

Administrative Penalty - These public notices provide information associated with Administrative Penalties. An Administrative Penalty can be assessed to address violations associated with issued Department of the Army permits.

SAJ-2004-01679 (SP-JSC)

Published April 16, 2018
Expiration date: 5/7/2018

TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:

APPLICANT: Bart de Bruijn
Managing Member
Cocoa 524 LLC
1716 Park Street N.
St. Petersburg, Florida 33710

WATERWAY AND LOCATION: The ±150-acre The Preserve at Cocoa project site is located south of SR 524, and east I-95, in Brevard County (Sections 13 and 24, Township 24 South, Range 35 East), Florida. The project area drains to Mud Lake and is within the St. Johns River Lake Winder Watershed (Hydrologic Unit Code #0308010107).

Directions to the site are as follows: From I-95, proceed east on SR 524 approximately two miles. The project site is on the south side of the road.

APPROXIMATE CENTRAL COORDINATES:

Latitude 28.39388º
Longitude -80.77382º

PROJECT PURPOSE:

Basic: residential/commercial construction.

Overall: The overall purpose of this project is residential and commercial development in Brevard County.

EXISTING CONDITIONS: The majority of the undeveloped ±150-acre project site is comprised of Mud Lake and surrounding floodplain. Forested uplands (Live Oak FLUCCS 427) occur along the SR 524 frontage but quickly transition to forested wetlands adjacent to Mud Lake. On-site wetland communities include Mixed hardwood wetlands (FLUCCS 617), wetland scrub (FLUCCS 631) and freshwater marsh (FLUCCS 641).
PROPOSED WORK: The applicant seeks reauthorization to fill and/or convert 4.29 acres of waters of the United States (i.e., 4.14 acres wetland; 0.15 acre ditch) to non-jurisdictional features for construction of five condominiums, five commercial tracts, and stormwater treatment.

AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment:

“See attached letter from Bussen-Mayer dated February 6, 2006 for Avoidance, Minimization and Compensation.”

COMPENSATORY MITIGATION – The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment:

“The previous permittee purchased 3.0 mitigation bank credits from Farmton Mitigation Bank.”

CULTURAL RESOURCES:

The Corps is not aware of any known historic properties within the permit area, which is defined by the entire 150 acre site. By copy of this public notice, the Corps is providing information for review. A cultural resource assessment survey was conducted in June 2005 and documented in the report entitled “An Archaeological Survey of the Proposed Treetop Condominiums, Brevard County, Florida”. No archaeological sites or historic structures were identified during the investigation and the Corps previously concluded the development would have no effect on cultural resources. The State Historic Preservation Office provided a concurrence letter dated June 26, 2006.

ENDANGERED SPECIES:

The proposed activity is within the Core Foraging Area (CFA) of a wood stork rookery; the project supports marginally Suitable Foraging Habitat (SFH) for wood stork. Based on the Effect Determination Key for the Wood Stork in Central and North Peninsular Florida (dated September 2008), the Corps determination sequence was A>B>C>E = “may affect, not likely to adversely affect”. The determination is supported by SFH compensation provided within the service area of a mitigation bank which covers the CFA, and provides an amount of habitat and foraging function equivalent to that of impacted SFH; is not contrary to the Service’s Habitat Management Guidelines For The Wood Stork In The Southeast Region and in accordance with the CWA Section 404(b)(1) guidelines. The Corps has U.S. Fish and Wildlife Service concurrence for the proposed activities through the use of the aforementioned determination key.

The Corps has determined the proposed project “may affect, but is not likely to adversely affect” the Eastern Indigo Snake. Based on the Eastern Indigo Snake Effect Determination Key (dated January 25, 2010; August 13, 2013 Addendum), the Corps determination sequence is as follows: A (The project is not located in open water or salt marsh.) >B (The permit will be conditioned for use of the Service’s Standard Protection Measures for the Eastern Indigo Snake during site preparation and protection construction.) >C (There are gopher tortoise burrows, holes, cavities, or other refugia where a snake could be buried or trapped and injured during project activities.) >D (The project will impact less than 25 acres of xeric habitat supporting less than 25 active and inactive gopher tortoise burrows ) >E (Any permit will be conditioned such that all gopher tortoise burrows, active or inactive, will be evacuated prior to site manipulation in the vicinity of the burrow) = NLAA. The permittee agrees to use the Standard Protection Measures for the Eastern Indigo Snake (dated August 12, 2013). If an indigo snake is encountered, the snake must be allowed to vacate the area prior to additional site manipulation in the vicinity. Any permit will also be conditioned such that holes, cavities, and snake refugia other than gopher tortoise burrows will be inspected each morning before planned site manipulation of a particular area, and, if occupied by an indigo snake, no work will commence until the snake has vacated the vicinity of proposed work. The Corps has U.S. Fish and Wildlife Service concurrence for the proposed activities through the use of the aforementioned determination key.

The project is within the Consultation Area for Florida scrub jay, Audubon’s crested caracara and Everglades Snail Kite. Based on existing habitat types, the Corps preliminarily determined the project will have no effect on these species.

ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal would impact approximately 4.03 acres of Mixed hardwood wetlands (FLUCCS 617) located in the St. Johns River watershed. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in either the upper St. Johns River. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.

NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.

AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.

COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Cocoa Permits Section, 400 High Point Drive, Suite 600, Cocoa, Florida 32926 within 21 days from the date of this notice.

The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.

QUESTIONS concerning this application should be directed to the project manager, Jeffrey Collins, in writing at the Cocoa Permits Section, 400 High Point Drive, Suite 600, Cocoa, Florida, 32926; by electronic mail at Jeffrey.S.Collins@usace.army.mil; by fax at (321) 504-3803, or by telephone at (321) 504-3771 extension 13.

IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.

The Corps is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.

REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.