The Corps plans to begin another seven-day pulse release from the lake tomorrow (March 12). The target flow for the Caloosahatchee during this period is unchanged at an average of 2,500 cubic feet per second (cfs) as measured at W.P. Franklin Lock & Dam (S-79) near Fort Myers. The target flow to the St. Lucie is also unchanged at 950 cubic feet per second (cfs) as measured at St. Lucie Lock & Dam (S-80) near Stuart.