Formerly Used Defense Sites (FUDS)

The island of Culebra, and its associated islands (cayos or keys), are located 17 miles east of the mainland of Puerto Rico and 9 miles north of the island of Vieques. 

The Defense Environmental Restoration Program (DERP) was established by Section 211 of the Superfund Amendments and Reauthorization Act (SARA) of 1986.

Between 1903 and 1975, the U.S. Navy and the U.S. Marine Corps used Culebra to resupply coal on ships, communications, and training.  The U.S. Army Corps of Engineers (USACE) divided the island and cayos into project areas in order to prioritize environmental investigations to address the potential presence of munitions (click the Project Area tab to left to see a map and list).  This prioritization did not include the area designated as the Northwest Peninsula since the law that authorized transferring the property from the Navy to the Commonwealth of Puerto Rico prohibits the use of federal funds for its cleanup.  However, Congress did authorize restoration of some recreational areas within the Northwest Peninsula, specifically, portions of the Carlos Rosario, Tamarindo, and Flamenco beaches; Carlos Rosario Trail; and the Flamenco campground.

Click on the tabs to the left to find more information about the projects and to read documents from previous and current investigations.

RECOGNIZE - The object you found could be dangerous.
RETREAT - Leave the area without touching or moving the object.
REPORT - Call 911 immediately.

Map, (Downloadable version)

 

 

 

 

 

 

 

 

 

 

 

 

List of Projects in Culebra, (Downloadable version)

List of Projects in Culebra

Project Number

Project Name

Project Type

Phase

00

US Navy Headquarters/Maintenance Area

Non- Munitions

Remedial Investigation/ Feasibility Study

01

Not Used

02

Culebra Adjacent Cays (Land and Water)

Munitions

Remedial Investigation/ Feasibility Study

03

Flamenco Bay Water Area (Water)

Munitions

Remedial Investigation/

Feasibility Study

04

Flamenco Beach Maneuver Area (Land)

Munitions

Remedial Investigation/ Feasibility Study

05

Mortar and Combat Range Area (Land)

Munitions

Remedial Investigation/ Feasibility Study

06

Artillery Firing Area (Land)

Munitions

Remedial Investigation/ Feasibility Study

07

Culebrita and Cayo Botella Impact Area (Land and Water)

Munitions

Remedial Investigation/

Feasibility Study

08

Cayo Norte Impact Area (Land)

Munitions

Remedial Investigation/ Feasibility Study

09

Soldado Point Mortar and Bombing Areas (Land and Water)

Munitions

Remedial Investigation/ Feasibility Study

10

Defensive Firing Area 1 (Land and Water)

Munitions

Remedial Investigation/

Feasibility Study

11

Defensive Firing Area 2 (Land and Water)

Munitions

Remedial Investigation/ Feasibility Study

12

Luis Peña Channel (Water)

Munitions

Remedial Investigation/ Feasibility Study

13

Cayo Luis Peña Impact Area (Land and Water)

Munitions

Remedial Investigation/ Feasibility Study

14

Airport and Camp Area (Land)

Munitions

No Action Required

15

Community Relations

On-Going Communication with

Community

16

Congressionally Authorized Areas in the Northwest Peninsula (Land)

Munitions

Interim Removal Action - Complete

17

Remaining Lands (Land)

Munitions

No Action Required

Project Status Update - August 2011
Restoration Advisory Board Solicitation Letter - August 2011
Project Status Update - November 2011
Project Status Update - April 2012
Project Status Update - November 2014
Restoration Advisory Board Letter to Current Members - February 2015
Project Status Update - May 2015
Project Status Update - October 2015
Project Status Update - November 2015
Project Status Update - April 2016
Project Status Update - October 2016
Time Critical Removal Action Postcard - Cayo del Agua, Cayo Botella and the Northwest Peninsula - MRS 02, 07 and 16 - October 2016
Project Status Update - March 2017
MRSPP Score Notice Postcard - Northwest Peninsula - MRS 16 - April 2017
Project Status Update - May 2017
Project Status Update - November 2017
Project Status Update - April 2018
Community Meeting Notice Postcard - May 2018
Project Status Update - December 2018
Restoration Advisory Board Interest Postcard - March 2019
Community Meeting Postcard - April 2019
Project Status Update - July 2019
Project Status Update - March 2020
Community Meeting Postponed Postcard - April 2020
Northwest Peninsula Fieldwork Postcard - MRS 16 - July 2020
Project Status Update - January 2021
Project Status Update - September 2021
Proposed Plan Public Meeting Letter to all Boxholders - October 2021
Project Status Update - July 2022
Restoration Advisory Board Reassessment Postcard - January 2023

Collapse All Expand All

Inventory Project Report/Approval Memo - 1991

Site-Specific Removal Action Work Plan - 1993

Archives Search Report Findings - 1995

Interim Remedial Action Final Removal Report - Flamenco Beach Campground - MRS 02 - 1995

HTRW Site Inspection - Lower Camp Debris Site - Project Area 00 - 1996

Final Engineering Evaluation Cost Analysis - 1997

Revised Inventory Project Report - 1997

Preliminary Points of Agreement - 2004

Site-Specific Final Report - Removal Action at Culebra National Wildlife Refuge - MRS 02 - 2004

Supplemental Archives Search Report - 2004

Findings and Determination of Eligibility - 2005

Ordnance and Explosives Archives Search Report - Culebra Island - Northwest Wildlife Refuge - MRS 16 - 2005

Revised Final Inventory Project Report (INPR) Including Original INPR - 2005

Supplemental Archives Search Report - 2005

Non-Time Critical Removal Action Work Plan - Municipality of Culebra - MRS 02 and 07 - 2006

Environmental and Cultural Resources Survey - Cayo Lobo - MRS 02 - 2006

Environmental and Cultural Resources Survey - Isla Culebrita - MRS 07 - 2006

Environmental and Cultural Resources Survey Draft - Cerro Balcon - MRS 02 - 2006

Site-Specific Work Plan Addendum - Programmatic Work Plan - MRS 02 and 07 - 2006

Site Inspection Report - Culebra Island Site - Volume I of II - 2007

Site Inspection Report - Culebra Island Site - Volume II of II - 2007

Marine Towed Array Demonstration - 2007

Final Work Plan - Non-Time Critical Removal Action - Culebrita and Culebra Beaches (portion of Flamenco Beach) - MRS 04 and 07 - 2007

Site-Specific Final Report - Non-Time Critical Removal Action - Cerro Balcon and Cayo Lobo - MRS 02 - 2009

Site-Specific Final Report - Non-Time Critical Removal Action - Culebrita and Culebra Beaches (portion of Flamenco Beach) - MRS 04 and 07 - 2009

Site-Specific Final Report - Non-Time Critical Removal Action - Culebrita and Culebra Beaches (portion of Flamenco Beach) - MRS 04 and 07 - February 2009; Amended August 2009

Remedial Investigation/Feasibility Study Work Plan - Land - MRS 02, 04, 05 and 07 - 2010

HTRW Site Inspection Work Plan - Lower Camp Debris Site - Project Area 00 - 2010

HTRW Site Inspection Report - Lower Camp Debris Site - Project Area 00 - 2011

Remedial Investigation/Feasibility Study Work Plan - Land - MRS 06, 08, 09, 10, 11 and 13 - 2011

Congressional Study of the Northwest Peninsula Site - 2012

Environmental Baseline Study - Work Plan - Water - MRS 09 and 13 - 2012

Environmental Baseline Survey - Work Plan - Water - MRS 03 and 12 - 2012

Environmental Baseline Survey - Work Plan - Water - MRS 02 and 07 - 2013

Revised Remedial Investigation/Feasibility Study Work Plan - Land - MRS 06, 08, 09, 10, 11 and 13 - 2013

Remedial Investigation Report - Land - MRS 02, 04, 05 and 07 - 2013

Environmental Baseline Survey Report - Water - MRS 02 and 07 - 2014

Environmental Baseline Survey Report - Water - MRS 03 and 12 - 2014

Environmental Baseline Survey Report  - Water - MRS 09 and 13 - 2014

Remedial Investigation/Feasibility Study Phase 2 and 3 Work Plan - Water - MRS 09 and 13 - 2014

Remedial Investigation/Feasibility Study Work Plan Addendum - MRS 02, 04, 05 and 07 - 2015

Remedial Investigation/Feasibility Study Phase 2 Work Plan - Water - MRS 02 and 07 - 2015

Remedial Investigation/Feasibility Study Phase 2 Work Plan - Appendix B - Water - MRS 02 and 07 - 2015

Remedial Investigation/Feasibility Study Phase 2 Work Plan - Appendix L - Water - MRS 02 and 07 - 2015

Remedial Investigation/Feasibility Study Phase 2 Work Plan - Appendix N - Water - MRS 02 and 07 - 2015

Remedial Investigation/Feasibility Study Phase 2 Work Plan - Water - MRS 03 and 12 - 2015

Revised Inventory Project Report - Northwest Peninsula - MRS 16 - 2016

Abbreviated Preliminary Assessment Report - Northwest Peninsula - MRS 16 - 2016

Remedial Investigation/Feasibility Study Phase 3 Work Plan - Water - MRS 02 and 07 - 2016

Remedial Investigation Report - Water - MRS 09 and 13 - 2016

Quality Assurance Project Plan - Time Critical Removal Action - Land - Cayo del Agua - MRS 02 - 2016

Quality Assurance Project Plan - Time Critical Removal Action - Land - Cayo Botella - MRS 07 - 2016

Quality Assurance Project Plan - Time Critical Removal Action - Land - Northwest Peninsula - MRS 16 - 2016

Remedial Investigation Report - Terrestrial Areas - MRS 06, 08, 09, 10, 11 and 13 - 2017

Remedial Investigation Report - Terrestrial Areas - Appendix A-Maps - MRS 06, 08, 09, 10, 11 and 13 - 2017

Remedial Investigation Phase 3 Work Plan - Water - MRS 03 and 12 - 2018

Site-Specific Final Report - Time Critical Removal Action - Specific Areas within the Northwest Peninsula - MRS 16 - 2019

Site-Specific Final Report - Time Critical Removal Action - Cayo Botella - MRS 07 - 2020

Final UFP - Quality Assurance Project Plan Amendment - Northwest Peninsula - MRS 16 - 2020

Uniform Federal Policy Quality Assurance Project Plan - Lower Camp Debris Site - Project Area 00 - 2020

Site-Specific Final Report - Time Critical Removal Action - Cayo del Agua - MRS 02 - April 2021

Remedial Investigation/Feasibility Study Report - Land - MRS 02, 04, 05, 07 and 17 - May 2021

Revised Remedial Investigation/Feasibility Study Report - Land - MRS 02, 04, 05, 07 and 17 - May 2021

Final UFP-QAPP for RI/FS underwater areas of Defensive Firing Area #1 (MRS 10) and Defensive Firing Area #2 (MRS 11) - June 2021

Proposed Plan - MRS 02, 04, 05, 07 and 17 - November 2021

Proposed Plan Public Meeting Transcript - Land - MRS 02, 04, 05, 07 and 17 - English - November 9 2021

Proposed Plan Public Meeting Transcript - Land - MRS 02, 04, 05, 07 and 17 - Spanish - November 9 2021

UXO and MD Recovered 30 September 2021 - 01 December 2021

Remedial Investigation Report - Water - MRS 02 and 07 - February 2022

Decision Document for Remaining Lands - MRS 17 - August 10 2022

Decision Document for Flamenco Beach Maneuver Area - MRS 04 - September 2022

Interim Remedial Action Final Removal Report - Flamenco Beach Campground - MRS 02 - 1995

Site-Specific Final Report - Removal Action at Culebra National Wildlife Refuge - MRS 02 - 2004

Non-Time Critical Removal Action Work Plan - Municipality of Culebra - MRS 02 and 07 - 2006

Environmental and Cultural Resources Survey - Cayo Lobo - MRS 02 - 2006

Environmental and Cultural Resources Survey Draft - Cerro Balcon - MRS 02 - 2006

Site-Specific Work Plan Addendum - Programmatic Work Plan - MRS 02 and 07 - 2006

Site Inspection Report - Culebra Island Site - Volume I of II - 2007

Site Inspection Report - Culebra Island Site - Volume II of II - 2007

Site-Specific Final Report - Non-Time Critical Removal Action - Cerro Balcon, Cayo Lobo and Isla Culebrita - MRS 02 and 07 - 2009

Remedial Investigation/Feasibility Study Work Plan - Land - MRS 02, 04, 05 and 07 - 2010

Congressional Study of the Northwest Peninsula - 2012

Environmental Baseline Survey - Work Plan - Water - MRS 02 and 07 - 2013

Remedial Investigation Report - Land - MRS 02, 04, 05 and 07 - 2013

Environmental Baseline Survey Report - Water - MRS 02 and 07 - 2014

Remedial Investigation/Feasibility Study Work Plan Addendum - MRS 02, 04, 05 and 07 - 2015

Remedial Investigation/Feasibility Study Phase 2 Work Plan - Water - MRS 02 and 07 - 2015

Remedial Investigation/Feasibility Study Phase 2 Work Plan - Appendix B - Water - MRS 02 and 07 - 2015

Remedial Investigation/Feasibility Study Phase 2 Work Plan - Appendix L - Water - MRS 02 and 07 - 2015

Remedial Investigation/Feasibility Study Phase 2 Work Plan - Appendix N - Water - MRS 02 and 07 - 2015

Remedial Investigation/Feasibility Study Phase 3 Work Plan - Water - MRS 02 and 07 - 2016

Quality Assurance Project Plan - Time Critical Removal Action - Land - Cayo del Agua - MRS 02 - 2016

Site-Specific Final Report - Time Critical Removal Action - Cayo del Agua - MRS 02 - 2021

Remedial Investigation/Feasibility Study Report - Land - MRS 02, 04, 05, 07 and 17 - 2021

Revised Remedial Investigation/Feasibility Study Report - Land - MRS 02, 04, 05, 07 and 17 - 2021

Proposed Plan - MRS 02, 04, 05, 07 and 17 - 2021

Proposed Plan Public Meeting Transcript - Land - MRS 02, 04, 05, 07 and 17 - English - November 9 2021

Proposed Plan Public Meeting Transcript - Land - MRS 02, 04, 05, 07 and 17 - Spanish - November 9 2021

UXO and MD Recovered 30 September 2021 - 01 December 2021

Remedial Investigation Report - Water - MRS 02 and 07 - 2022

Non-Time Critical Removal Action Work Plan - Municipality of Culebra - MRS 02 and 07 - 2006

Environmental and Cultural Resources Survey - Isla Culebrita - MRS 07 - 2006

Site-Specific Work Plan Addendum - Programmatic Work Plan - MRS 02 and 07 - 2006

Site Inspection Report - Culebra Island Site - Volume I of II - 2007

Site Inspection Report - Culebra Island Site - Volume II of II - 2007

Final Work Plan - Non-Time Critical Removal Action - Culebrita and Culebra Beaches (portion of Flamenco Beach) - MRS 04 and 07 - 2007

Site-Specific Final Report - Non-Time Critical Removal Action - Culebrita and Culebra Beaches (portion of Flamenco Beach) - MRS 04 and 07 - 2009

Site-Specific Final Report - Non-Time Critical Removal Action - Cerro Balcon, Cayo Lobo and Isla Culebrita - MRS 02 and 07 - 2009

Remedial Investigation/Feasibility Study Work Plan - Land - MRS 02, 04, 05 and 07 - 2010

Environmental Baseline Survey - Work Plan - Water - MRS 02 and 07 - 2013

Remedial Investigation Report - Land - MRS 02, 04, 05 and 07 - 2013

Environmental Baseline Survey Report - Water - MRS 02 and 07 - 2014

Remedial Investigation/Feasibility Study Work Plan Addendum - MRS 02, 04, 05 and 07 - 2015

Remedial Investigation/Feasibility Study Phase 2 Work Plan - Water - MRS 02 and 07 - 2015

Remedial Investigation/Feasibility Study Phase 2 Work Plan - Appendix B - Water - MRS 02 and 07 - 2015

Remedial Investigation/Feasibility Study Phase 2 Work Plan - Appendix L - Water - MRS 02 and 07 - 2015

Remedial Investigation/Feasibility Study Phase 2 Work Plan - Appendix N - Water - MRS 02 and 07 - 2015

Remedial Investigation/Feasibility Study Phase 3 Work Plan - Water - MRS 02 and 07 - 2016

Quality Assurance Project Plan - Time Critical Removal Action - Land - Cayo Botella - MRS 07 - 2016

Site-Specific Final Report - Time Critical Removal Action - Cayo Botella - MRS 07 - 2020

Remedial Investigation/Feasibility Study Report - Land - MRS 02, 04, 05, 07 and 17 - 2021

Revised Remedial Investigation/Feasibility Study Report - Land - MRS 02, 04, 05, 07 and 17 - 2021

Proposed Plan - MRS 02, 04, 05, 07 and 17 - 2021

Proposed Plan Public Meeting Transcript - Land - MRS 02, 04, 05, 07 and 17 - English - November 9 2021

Proposed Plan Public Meeting Transcript - Land - MRS 02, 04, 05, 07 and 17 - Spanish - November 9 2021

UXO and MD Recovered 30 September 2021 - 01 December 2021

Remedial Investigation Report - Water - MRS 02 and 07 - 2022

Remedial Investigation/Feasibility Study - Public Meeting Notice - Land Areas - May 2011

Remedial Investigation/Feasibility Study - Culebrita and Nearby Water Areas - MRS 02 and 07 - May 2011

Remedial Investigation/Feasibility Study - Flamenco Bay and Luis Pena Channel - MRS 03 and 12 - May 2011

Restoration Advisory Board Public Meeting Flyer - January 2015

Community Meeting Notice Flyer - August 2015

Community Meeting Notice Flyer - November 2015

Community Meeting Notice Flyer - May 2016

Time Critical Removal Action Question and Answer Flyer - November 2016

Time Critical Removal Action Fieldwork Flyer - Cayo del Agua, Cayo Botella, portions of Carlos Rosario Beach, Flamenco Beach campground - MRS 02 and 07 - November 2016

MRSPP Score Notice - Northwest Peninsula - MRS 16 - April 2017

Time Critical Removal Action Fact Sheet - Cayo del Agua, Cayo Botella and the authorized areas of the Northwest Peninsula - MRS 02, 07 and 16 - August 2017

Time Critical Removal Action Campground Fact Sheet - Cayo del Agua, Cayo Botella and the authorized areas of the Northwest Peninsula - MRS 02, 07 and 16 - August 2017

Time Critical Removal Action Fieldwork Fact Sheet - Cayo del Agua, Cayo Botella, portions of the Carlos Rosario Beach, Flamenco Beach, Tamarindo Beach, Carlos Rosario Trail and the Flamenco Beach campground - MRS 02, 07 and 16 - August 2017

Restoration Advisory Board Meeting Flyer - May 2018

Community Meeting Notice Flyer - May 2018

Community Meeting Notice Flyer - March 2019

Proposed Plan Public Meeting Flyer - October 2021

Restoration Advisory Board Reassessment Public Notice - January 2023

Site Summary Fact Sheet - May 2011

Project Description Fact Sheet - August 2011

Safety Brochure - English

Safety Brochure - Spanish

Safety Poster - English - Version 1

Safety Poster - English - Version 2

Safety Poster - English - Version 3

Safety Poster - Spanish - Version 1

Safety Poster - Spanish - Version 2

Safety Poster - Spanish - Version 3

Safety Poster - Diving - English - Version 1

Safety Poster - Diving - Spanish - Version 1

Safety Poster - Diving - English - Version 2

Safety Poster - Diving - Spanish - Version 2

Safety Posters - 2013

Program Summary Fact Sheet - October 2013

Time Critical Removal Action Fact Sheet - Cayo del Agua, Cayo Botella and the authorized areas of the Northwest Peninsula - October 2016

MRSPP Score Notice - Northwest Peninsula - MRS 16 - April 2017

Time Critical Removal Action Fact Sheet - Cayo del Agua, Cayo Botella and the authorized areas of the Northwest Peninsula - MRS 02, 07 and 16 - August 2017

Time Critical Removal Action Question and Answer Fact Sheet - Cayo del Agua, Cayo Botella and the authorized areas of the Northwest Peninsula - August 2017

MRSPP Fact Sheet - March 2018

MEC Safety Poster - English - March 2018

MEC Safety Poster - Spanish - March 2018

Underwater Fieldwork Fact Sheet - MRS 03 and 12 - February 2019

Safety Posters - April 2019

Site Summary Fact Sheet - September 2019

Time Critical Removal Action Question and Answer Fact Sheet - Northwest Peninsula, portions of Carlos Rosario Beach, Flamenco Beach, Tamarindo Beach, Carlos Rosario Trail and the campground - July 2020

FUDS - Program Summary - November 2021 - English

FUDS - Program Summary - November 2021 - Spanish

FUDS - MRSPP Fact Sheet - November 2021 - English

FUDS - MRSPP Fact Sheet - November 2021 - Spanish

Restoration Advisory Board Fact Sheet - January 2023 - English

Restoration Advisory Board Fact Sheet - January 2023 - Spanish