Public Notice Notifications

The Jacksonville District currently has five categories of public notice notification mailing lists. If you wish to receive email notifications when new public notices are added to this page, please send a request to Regulatory Webmaster.  Each category is described below. Be sure to specify which list(s) you want to be included on.

Florida - This includes all public notices for projects being reviewed for Standard Permits within the State of Florida.

Antilles - This includes all public notices for projects being reviewed for Standard Permits within the Antilles area (this includes Puerto Rico and the US Virgin Islands).

Tropical Storms & Other Emergencies - These public notices provide information on procedures for emergency permitting requirements due to specific tropical storm events or other emergency situations.

Special Issues - These are public notices that involve the Regulatory program but which are generally not limited to one particular geographic area. These would include public notices for the establishment or modification of Restricted Areas/Danger Zones, re-issuance of General Permits or Nationwide Permits, changes to guidance and policies, etc.

Administrative Penalty - These public notices provide information associated with Administrative Penalties. An Administrative Penalty can be assessed to address violations associated with issued Department of the Army permits.

SAJ-2014-02681

Published July 6, 2018
Expiration date: 8/5/2018

TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received a complete prospectus proposing the establishment of a mitigation bank pursuant to the 2008 Compensatory Mitigation for Losses of Aquatic Resources regulations (33 CFR Part 332) as described below:

APPLICANT: City of St. Petersburg
Attn: Mr. Brejesh Prayman, P.E.
PO Box 2842
St. Petersburg, FL 33731


LOCATION: The proposed project, identified as the North Shore Park Seagrass Mitigation Bank (NSPSMB), is located in the waters of Tampa Bay waterward of 901 North Shore Drive NE, St. Petersburg, Pinellas County, Florida. The site is east of Section 17, Township 31 South, and Range 17 East. The site is not within a Section, Township, and Range as these boundaries end at the shoreline.


APPROXIMATE CENTRAL COORDINATES:

Latitude: 27.783472°
Longitude: -82.619978°


PROSPECTUS SUMMARY: Pursuant to 33 CFR 332.8(d)(4), the Corps has posted a full copy of the NSPSMB prospectus online so that it is available for review by the public. The prospectus may be downloaded from the Regulatory In-Lieu Fee and Bank Information Tracking System (RIBITS) at web address: https://ribits.usace.army.mil.

Once on the RIBITS homepage, select "Jacksonville" from the "ALL DISTRICTS" drop down menu located in the lower left corner of the screen. Once the district filter has been selected, click on the “Banks & ILF Sites” link located in the Navigation box (upper left corner). This will generate a list of projects, scroll down the list and click on the “North Shore Park Seagrass MB” link. On this page, click on the "Cyber Repository" link located on the menu bar above the General Information box, then click on the Prospectus Documents folder to access the prospectus associated with the NSPSMB project.

If you are unable to access the web address, a copy of the prospectus is available upon request to the project manager listed at the end of this public notice.

PROJECT GOALS AND OBJECTIVES: The applicant seeks authorization to re-establish seagrass within a 31.70 acre dredge hole; re-establish seagrass within a historic spoil disposal area totaling 4.0 acres; reestablish seagrass within three depressional areas totaling 2.37 acres; and preserve the remaining 142 acres of existing seagrass within Tampa Bay. Specific restoration objectives include:

1. Perpetual protection. Preservation of the entire Bank site totaling 180 acres will be achieved by the granting of a perpetual conservation easement to the Southwest Florida Water Management District (SWFWMD) in a form acceptable to both SWFWMD and the USACE. The conservation easement, in conjunction with a City Ordinance, will create a “motor exclusion zone” within the boundaries of the Bank. Establishment of a boater regulatory zone will minimize manmade impacts to seagrasses within the Bank. Tampa Bay Watch has identified approximately 11,864 linear feet of scars within the Bank. It has been noted in Tampa Bay that many prop scars will recover on their own over a relatively short period of time, therefore these scars will be allowed to restore naturally. The boater regulatory zone will provide an immediate benefit to the health and quality of the Bank’s existing seagrass communities. The motor exclusion zone will prevent future scarring incidents. A long-term management plan will be recorded as an attachment to the conservation easement, ensuring that management of the site is consistent with the goals of the Bank in perpetuity.

2. Re-establishment of seagrass within the dredge hole. The 31.70-acre dredge hole will be backfilled to match adjacent healthy seagrass grades. The Bank will provide a valuable disposal location for major new or maintenance dredging operations currently being evaluated by the USACE. The City will coordinate with the USACE to designate the filling of the dredge hole as a “Beneficial Use Project.” The dredge hole has been identified previously by the USACE as a placement site for dredge material. The dredge hole will be backfilled to adjacent grades with suitable material and subsequently revegetated with seagrass plugs from the adjacent seagrass meadows within a City-owned seagrass donor site, immediately north and adjacent to Coffee Pot Bayou entrance channel.

3. Re-establishment of seagrass within spoil disposal area. The City has evaluated the appropriateness of restoring and planting the 4.0 acres of barren spoil disposal area with seagrass. This area (Area A on the Figure 3), has never recovered from the dredging of the Coffee Pot Bayou channel due to limiting shallow water depths. Based on preliminary topography, it appears that approximately 8 to 12 inches of sediment will need to be removed from these areas to reach surrounding grades to facilitate establishment by seagrass.

4. Re-establishment of seagrass within three depressions. The City has evaluated the appropriateness of restoring and planting 3 depressional areas (Areas B, C, and D on Figure 3) totaling 2.37 acres. These unnatural depressions are likely the result of dredging activities or changes in water flow that have occurred due to the effects of the large dredge hole. Currents are focused in this area, particularly Area C, between the dredge hole and Coffee Pot Bayou channel, creating an erosional scour hole. The higher water flow has resulted in a depressional area with little to no seagrass. Area D has been similarly dredged by scouring as a result of altered water currents. These three depressional areas will be filled with some of the material dredged from Area A. Once these depressions are filled water flow across these areas of the flats will be reduced to normal sheet flow and allow conditions for the planting of seagrass.

All credits generated by the Bank will be assessed using the Uniform Mitigation Assessment Method (UMAM) developed by the State of Florida. All credits generated will be marine credits comprised of seagrass meadows. This habitat type is classified as
Seagrass (911) under the Florida Land Use, Cover, and Forms Classification System (FLUCCS).

ECOLOGICAL SUITABILITY OF THE SITE: A review of available information indicates that the property historically consisted of Seagrass.

ESTABLISHMENT AND OPERATION OF THE BANK: The proposed NSPSMB would be established and operated by the City of St. Petersburg as the Sponsor with the assistance of Tampa Bay Watch, Inc. The property that comprises the NSPSMB is owned by the City of St. Petersburg. The NSPSMB is proposed to be established as a single and complete project. Following NSPSMB successful implementation and attainment of final success criteria, long-term management activities will be implemented in order to ensure the sustainability of NSPSMB. In addition, the Sponsor will provide sufficient financial assurances to ensure construction and long-term management of the proposed NSPSMB.

PROPOSED SERVICE AREA: The project is located directly adjacent to the Grand Bayou and Lake Maggiore Subwatersheds, identified as Hydrologic Unit Codes (HUC 031002060604 and 031002060604. The Applicant proposes a Mitigation Service Area (MSA) that comprises the coastal (nearshore) and offshore waters (to 20 miles) of 5 8-digit HUC basins. The service area includes the Withlacoochee (HUC 03100208), Crystal-Pithlachascotee (HUC 03100207), Tampa Bay (HUC 03100206), Sarasota Bay (HUC 03100201), and Charlotte Harbor (HUC 03100103). The NSPSMB MSA is anticipated to include wetland habitat communities that could reasonably be expected to occur on the NSPSMB.

CULTURAL RESOURCES: The proposed bank is not expected to have any direct or indirect impact to cultural resources. Project review will, however, include review of the proposal for any potential impact to cultural resources.


ENDANGERED SPECIES: The site will be reviewed for potential critical habitat and presence of endangered species. The findings will be coordinated with the U.S. Fish and Wildlife service.

ESSENTIAL FISH HABITAT (EFH): The proposed bank is located in EFH for Shrimp and Red Drum. This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in Tampa Bay. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.

NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program.

REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

COMMENTS: Comments regarding the proposed mitigation bank should be submitted in writing to the District Engineer at the address below within 30 days from the date of this notice.

The initial evaluation pertaining to whether or not this mitigation bank proposal has the potential for providing compensatory mitigation for activities authorized by issued Department of the Army permits will be based on the information contained in the prospectus, received from this public notice and obtained during an inspection of the project site.

If you have any questions concerning this proposed project, you may contact Mr. Steven Currie by electronic mail at steven.j.currie@usace.army.mil, by fax at 904-232-1904, or by telephone at 904-232-3701 or at the following address:

DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
P. O. BOX 4970
JACKSONVILLE, FLORIDA 32232-0019


IMPACT ON NATURAL RESOURCES: Preliminary review of this application indicates that an Environmental Impact Statement will not be required. Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area. By means of this notice, we are soliciting comments on the potential effects of the project on threatened or endangered species or their habitat

EVALUATION: After the end of the comment period, the district engineer will review all comments received and make an initial determination as to the potential of the proposed project to provide compensatory mitigation for activities authorized by Department of the Army permits. That determination will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. Factors relevant to the proposal will be considered including conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the proposed activity. All comments received will be considered by the Corps during the formulation of the initial determination of potential for the proposed activity.