Digital Terrain Modules (DTM)

Digital Terrain Models (DTM), Alignment (ALG), and requisite raw data in XML format are available for informational purposes only. The Government assumes no responsibility for any apparent errors that may be present in the DTM or raw data; nor does the Government assume responsibility for any conclusions or interpretations made by the Contractor based on the provided DTM, or raw data. The available information may include DTM surfaces for the existing site grades, excavation grades, and finished grades. The excavation DTM may not fully define surfaces related to temporary cuts required for site features such as stormwater management and erosion control components. Further, the excavation DTM may not reflect embankment foundation details such as soil benching. The finished grade DTM may not fully define surfaces related to site features such as stormwater management and erosion control components. Further, the finished grade DTM may not reflect embankment penetrations, internal embankment components such as seepage collection systems, nor embankment slope protection.

W912EP-11-R-0030

W912EP-11-R-0036

W912EP-12-R-0016

W912EP-12-R-0025

W912EP-13-R-0021 (C5)

W912EP-13-R-0021 (C5A)

W912EP-13-R-0027 (C8)

W912EP-13-R-0027 (C13)

W912EP-14-R-0017

W912EP-14-B-0001

W912EP-15-R-0013 (S-271 - C-10A)

W912EP-14-R-0018 (S-286 - HP-3)

W912EP-14-R-0018 (S-287 - HP-2)

W912EP-15-B-0001 (KRR CNT 10B)

W912EP-14-R-0016 (C-44 Reservoir/STA GDR Contract 2)

W912EP-14-R-0016 (C-44 Reservoir/STA GDR Contract 2 Appendices A to C)

W912EP-14-R-0016 (C-44 Reservoir/STA GDR Contract 2 Appendices D)

W912EP-14-R-0016 (C-44 Reservoir/STA GDR Contract 2 Appendices E to J)

W912EP-14-R-0016 (C-44 Soil Cement Draft Report)

Herbert Hoover Dike (KI1 and KI2)

Herbert Hoover Dike (S285 - HP6)