Effective immediately: public notices are published with only the vicinity map, plan view and cross-section drawing. If you are interested in receiving additional project drawings associated with any public notice, please send an email to the project manager at the email address listed in the public notice.

 

Public Notice Notifications

The Jacksonville District currently has five categories of public notice notification mailing lists. If you wish to receive email notifications when new public notices are added to this page, please send a request to Regulatory Webmaster.  Each category is described below. Be sure to specify which list(s) you want to be included on.

Florida - This includes all public notices for projects being reviewed for Standard Permits within the State of Florida.

Antilles - This includes all public notices for projects being reviewed for Standard Permits within the Antilles area (this includes Puerto Rico and the US Virgin Islands).

Tropical Storms & Other Emergencies - These public notices provide information on procedures for emergency permitting requirements due to specific tropical storm events or other emergency situations.

Special Issues - These are public notices that involve the Regulatory program but which are generally not limited to one particular geographic area. These would include public notices for the establishment or modification of Restricted Areas/Danger Zones, re-issuance of General Permits or Nationwide Permits, changes to guidance and policies, etc.

Administrative Penalty - These public notices provide information associated with Administrative Penalties. An Administrative Penalty can be assessed to address violations associated with issued Department of the Army permits.

SAJ-Proposed-2026-NWP-Regional-Conditions-All-of-Florida TDS

Jacksonville District
Published June 18, 2025
Expiration date: 8/4/2025

On June 18, 2025, the U.S. Army Corps of Engineers (Corps) published in the Federal Register its proposal to reissue 56 existing nationwide permits (NWPs) with some modifications and to issue one new NWP. One NWP is not proposed for reissuance.

NWPs are general permits issued on a nationwide basis to streamline the authorization of activities that result in no more than minimal individual and cumulative adverse environmental effects. Many of the proposed NWPs require notification to the district engineer before commencing those activities, to ensure that the activities authorized by those NWPs cause no more than minimal individual and cumulative adverse environmental effects.  

National Issues Concerning the Proposed NWPs:

The Federal Register notice is the public’s opportunity to comment on the proposed NWPs, general conditions, and definitions.  Comments on national issues relating to these NWPs should be submitted to docket number COE-2025-0002 at www.regulations.gov, or by email to 2026nationwidepermits@usace.army.mil or by mail to U.S. Army Corps of Engineers, Attn: CECW-CO-R, 441 G Street NW, Washington, DC 20314-1000. Instructions for submitting comments are provided in the June 18, 2025 Federal Register notice. Comments on the proposed NWPs are due by July 18, 2025.

Regional Issues Concerning the Proposed NWPs, Including Regional Conditioning:

 Division engineers are authorized to add regional conditions specific to the needs and/or requirements of a particular region or state. Regional conditions are an important mechanism to help ensure that the adverse environmental effects of activities authorized by the NWPs are no more than minimal, both individually and cumulatively. Division engineers may also suspend or revoke specific NWPs in certain geographic areas (e.g., states or watersheds) or high-value aquatic systems where the adverse environmental effects caused by activities authorized by those NWPs may be more than minimal. An enclosure for this public notice (Enclosure 1) lists the proposed regional conditions currently under consideration by the Jacksonville District for the State of Florida. The Jacksonville District is seeking comments on the proposed regional conditions and seeking comments on the need for additional regional conditions to help ensure that the adverse environmental effects of activities authorized by the proposed NWPs are no more than minimal, individually and cumulatively. Unless otherwise noted, all proposed regional conditions listed on this enclosure are applicable for activities in  the State of Florida. After careful evaluation, the Jacksonville District is proposing to eliminate most of the 2021 NWP regional conditions. Many of the 2021 NWP regional conditions were only informative, were duplicative of the NWP general conditions, and/or described Jacksonville District internal or interagency process. Other 2021 NWP regional conditions were only applicable to the Antilles, which is now within the area of responsibility of the Caribbean District. Some 2021 NWP regional conditions required submittal of PCNs for specific NWPs. These regional conditions were eliminated because those specific NWPs already require submittal of PCNs or PCNs would be required by a NWP general condition. The Jacksonville District intends to provide helpful information to assist prospective permittees in fulfilling their obligations under the NWP general and regional conditions by posting an informational document to the Jacksonville District Regulatory web page after the final NWPs and regional conditions go into effect. The substance of many of the 2021 regional conditions which were informational only will be incorporated into this document. For example, it will explain how to determine when an activity may affect a listed species, triggering the requirement for PCN under General Condition 18.  Similarly, it will note the Designated Critical Resource Waters within the State of Florida to which General Condition 22 applies. Comments on regional issues relating to the proposed NWPs and proposed regional conditions should be sent to Jacksonville District, 701 San Marco Boulevard, Jacksonville, Florida, by phone at 813-233-6877, or by email to CESAJ-NWP-2026@usace.army.mil.   Comments relating to regional conditions are due by August 4, 2025. Similar public notices proposing regional conditions in other regions or states are being published concurrently by other division or district offices. After the final NWPs are issued, the final regional conditions will be issued after they are approved by the Division Commander.

401 Water Quality Certification and Coastal Zone Management Act:

States, tribes, and other certifying authorities will make their Clean Water Act Section 401 water quality certification (WQC) decisions after reviewing the proposed NWPs. States will make their Coastal Zone Management Act (CZMA) consistency determination decisions after reviewing the proposed NWPs.

Draft Decision Documents:

Draft decision documents for each of the proposed NWPs, which include environmental documentation prepared for the purposes of the National Environmental Policy Act, have been written by Corps Headquarters. The decision documents will address compliance of the NWPs with the requirements for issuance under the Corps’ general permit authority. These draft decision documents, as well as the proposed NWPs, are available for viewing at www.regulations.gov, docket number COE-2025-0002. Final decision documents will be prepared for the NWPs that are issued. 

 

Enclosed is an index of the proposed NWPs and conditions. Anyone wishing to provide comments may obtain a full text copy of the NWPs through the Corps Home Page at https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-Permits/Nationwide-Permits/, at www.regulations.gov in docket number COE-2025-0002, or at the following Federal Register address: https://www.federalregister.gov/documents/2025/06/18/2025-11190/proposal-to-reissue-and-modify-nationwide-permits

 

Enclosure 2

 

Index of Proposed Nationwide Permits, General Conditions, and Definitions

 

Nationwide Permits

1. Aids to Navigation

2. Structures in Artificial Canals

3. Maintenance

4. Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities

5. Scientific Measurement Devices

6. Survey Activities

7. Outfall Structures and Associated Intake Structures

8. Oil and Gas Structures on the Outer Continental Shelf

9. Structures in Fleeting and Anchorage Areas

10. Mooring Buoys

11. Temporary Recreational Structures

12. Oil or Natural Gas Pipeline Activities

13. Bank Stabilization

14. Linear Transportation Projects

15. U.S. Coast Guard Approved Bridges

16. Return Water From Upland Contained Disposal Areas

17. Hydropower Projects

18. Minor Discharges

19. Minor Dredging

20. Response Operations for Oil or Hazardous Substances

21. Surface Coal Mining Activities

22. Removal of Vessels

23. Approved Categorical Exclusions

24. Indian Tribe or State Administered Section 404 Programs

25. Structural Discharges

26. [Reserved]

27. Aquatic Ecosystem Restoration, Establishment, and Enhancement Activities

28. Modifications of Existing Marinas

29. Residential Developments

30. Moist Soil Management for Wildlife

31. Maintenance of Existing Flood Control Facilities

32. Completed Enforcement Actions

33. Temporary Construction, Access, and Dewatering

34. Cranberry Production Activities

35. Maintenance Dredging of Existing Basins

36. Boat Ramps

37. Emergency Watershed Protection and Rehabilitation

38. Cleanup of Hazardous and Toxic Waste

39. Commercial and Institutional Developments

40. Agricultural Activities

41. Reshaping Existing Drainage Ditches

42. Recreational Facilities

43. Stormwater Management Facilities

44. Mining Activities

45. Repair of Uplands Damaged by Discrete Events

46. Discharges in Ditches

47. [Reserved]

48. Commercial Shellfish Mariculture Activities

49. Coal Remining Activities

50. Underground Coal Mining Activities

51. Land-Based Renewable Energy Generation Facilities

52. Water-Based Renewable Energy Generation Pilot Projects

53. Removal of Low-Head Dams

54. Living Shorelines

55. Seaweed Mariculture Activities

56. [Reserved]

57. Electric Utility Line and Telecommunications Activities

58. Utility Line Activities for Water and Other Substances

59. Water Reclamation and Reuse Facilities

A. Activities to Improve Passage of Fish and Other Aquatic Organisms

 

Nationwide Permit General Conditions

1. Navigation

2. Aquatic Life Movements

3. Spawning Areas

4. Migratory Bird Breeding Areas

5. Shellfish Beds

6. Suitable Material

7. Water Supply Intakes

8. Adverse Effects from Impoundments

9. Management of Water Flows

10. Fills Within 100-Year Floodplains

11. Equipment

12. Soil Erosion and Sediment Controls

13. Removal of Temporary Fills

14. Proper Maintenance

15. Single and Complete Project

16. Wild and Scenic Rivers

17. Tribal Rights

18. Endangered Species

19. Migratory Birds and Bald and Golden Eagles

20. Historic Properties

21. Discovery of Previously Unknown Remains and Artifacts

22. Designated Critical Resource Waters

23. Mitigation

24. Safety of Impoundment Structures

25. Water Quality

26. Coastal Zone Management

27. Regional and Case-by-Case Conditions

28. Use of Multiple Nationwide Permits

29. Transfer of Nationwide Permit Verifications

30. Compliance Certification

31. Activities Affecting Structures or Works Built by the United States

32. Pre-Construction Notification

 

District Engineer’s Decision

 

Further Information

 

Nationwide Permit Definitions

Best management practices (BMPs)

Compensatory mitigation

Currently serviceable

Direct effects

Discharge

Ecological reference

Enhancement

Establishment (creation)

High Tide Line

Historic property

Independent utility

Indirect effects

Loss of waters of the United States

Nature-based solutions

Navigable waters

Non-tidal wetland

Open water

Ordinary high water mark

Perennial stream

Practicable

Pre-construction notification

Preservation

Re-establishment

Rehabilitation

Restoration

Riffle and pool complex

Riparian areas

Shellfish seeding

Single and complete linear project

Single and complete non-linear project

Stormwater management

Stormwater management facilities

Stream bed

Stream channelization

Structure

Tidal wetland

Tribal lands

Tribal rights

Vegetated shallows

Waterbody

 

Click here for public notice