Results:
Tag: caloosahatchee estuary
Clear
  • October

    All in a day’s work: South Florida Operations Office multi-tasks all summer

    During normal operations, the staff is responsible for the Okeechobee Waterway, the recreation areas around the locks, maintenance on Herbert Hoover Dike, and numerous other tasks. However, as the water rose on Lake Okeechobee this summer, SFOO staff had to adjust duties to accommodate other priorities, such as weekly inspections of the 80-year-old dike.
  • Public input received during series of public meetings for Central Everglades Planning Project

    Five public meetings were held throughout south Florida Sept. 16-19 and Sept. 25 to discuss the draft report. Meeting attendants ranged from environmental, agricultural and recreational interest groups to high school students and local residents.
  • May

    Water managers prepare for wet season

    A different challenge facing water managers this year surrounds Lake Okeechobee and a higher water level this year, when compared to the previous two years. On April 23, the lake level was 13.59 feet, more than two feet higher than it was on the same date in 2011 and 2012. The lake has stayed within the Corps’ preferred range of 12.5 and 15.5 feet all winter. As a result, the district has been able to provide regular discharges of water to meet a wide variety of needs, including releases to the Caloosahatchee Estuary to keep the saltwater-freshwater mix in an acceptable range.