The U.S. Army Corps of Engineers Jacksonville District continues to monitor conditions and has adjusted releases from Lake Okeechobee accordingly.
Starting Saturday, March 30, the Corps reduced the pulse release to the Caloosahatchee estuary to a 7-day average rate of 1,000 cubic feet per second (cfs) from the W.P. Franklin Lock and Dam (S-79), as planned. In addition, the Corps reduced flows to the St. Lucie estuary down to zero cfs as measured at the St. Lucie Lock and Dam (S-80). Additional runoff from rain in the Caloosahatchee and St. Lucie basins could occasionally result in flows that exceed one or both targets