US Army Corps of Engineers
Jacksonville District Website

RPN Remaining

Collapse All Expand All

Sewer Line Relocation and Remaining Upper Margarita Channel (Sta 56+00 to Sta 89+60)

Roosevelt Bridge replacement

Channel Walls and Main Channel (Sta 88+33 to Sta 147+40).

Stilling Basin and Bridge Modifications of 4 Major Existing Bridges:
4A-1) Las Americas Expressway Bridge
4A-2) Piñero Avenue Bridge East
4A-3) NE Access Ramp Bridge
4A-4) SE Access Ramp Bridge

Bridge Replacement of Notre Dame Street Bridge and Piñero Avenue Bridge West.

Middle Main Channel - Sta. 147+40 to PR HWY 1 (Sta 240+00), 2 Buena Vista Bridge Replacement – Buena Vista Diversion Channel (Sta 0+00 to Sta. 42+37) and Construction of One Debris Basin.

Bridge Replacement of 10 Bridges, Quebrada Josefina (Piñero Avenue West Bridge South) Channel and Stilling Basins, Quebrada Doña Ana Channel and Stilling Basins.

  • Contract 1: Design, Real Estate, Procurement and Award by Dec 2021, Construction from 2022 - 2026
  • Contract 2: Design, Real Estate, Procurement and Award by April 2022, Construction from 2022 - 2025
  • Contract 3: Design, Real Estate, Procurement and Award by April 2022, Construction from 2022 - 2025
  • Contract 4: Design, Real Estate, Procurement and Award by Dec 2022, Construction from 2023 - 2027
  • Contract 5: Design, Real Estate, Procurement and Award by May 2023, Construction from 2023 - 2026
  • Contract 6: Design, Real Estate, Procurement and Award starting in 2021 and completed by June 2027, Construction from 2027 - 2032
  • Contract 7: Design, Real Estate, Procurement and Award starting in 2021 and completed by May 2026, Construction from 2026 - 2031

Antilles_Projects

Collapse All Expand All

Map of Puerto Rico with numbered location of projects

  1. Rio Puerto Nuevo, San Juan - $1,552 million
  2. Rio de La Plata, Dorado, Toa Baja, and Toa Alta - $500 million
  3. Rio Grande de Arecibo, Arecibo - $82.9 million
  4. Rio Grande de Loiza, Gurabo and Caguas - $250 million
  5. Rio Guanajibo at Mayaguez, San German, Hormigueros and Mayaguez - $60 million
  6. Rio Nigua at Salinas, El Coco, Salinas and Playa de Salinas - $60 million

Map of Puerto Rico with numbered location of harbors

Removal of storm-induced shoaling and debris.

Puerto Rico

  1. Arecibo Harbor
  2. San Juan Harbor
  3. Mayaguez Harbor

U.S. Virgin Islands

  • Christiansted Harbor - St. Croix

Map of Puerto Rico with numbered location of projects

  1. Loíza, Puerto Rico (CAP Section 14 - Emergency Streambank Protection)
  2. Salud Creek, Puerto Rico (CAP Section 14 - Emergency Streambank Protection)
  3. Río Antón Ruíz Restoration, Humacao, Puerto Rico (CAP Section 1135 - Project Modifications)
  4. Rio Descalabrado (CAP Section 205 - Flood Damage Reduction)

Caño Martin Peña