RPN Remaining

Collapse All Expand All
 Supplemental Contract 1 

Sewer Line Relocation and Remaining Upper Margarita Channel (Sta 56+00 to Sta 89+60)

 Supplemental Contract 2 

Roosevelt Bridge replacement

 Supplemental Contract 3 

Channel Walls and Main Channel (Sta 88+33 to Sta 147+40).

 Supplemental Contract 4 

Stilling Basin and Bridge Modifications of 4 Major Existing Bridges:
4A-1) Las Americas Expressway Bridge
4A-2) Piñero Avenue Bridge East
4A-3) NE Access Ramp Bridge
4A-4) SE Access Ramp Bridge

 Supplemental Contract 5 

Bridge Replacement of Notre Dame Street Bridge and Piñero Avenue Bridge West.

 Supplemental Contract 6 

Middle Main Channel - Sta. 147+40 to PR HWY 1 (Sta 240+00), 2 Buena Vista Bridge Replacement – Buena Vista Diversion Channel (Sta 0+00 to Sta. 42+37) and Construction of One Debris Basin.

 Supplemental Contract 7 

Bridge Replacement of 10 Bridges, Quebrada Josefina (Piñero Avenue West Bridge South) Channel and Stilling Basins, Quebrada Doña Ana Channel and Stilling Basins.

 Supplemental Contracts Implementation Schedule (As of Feb 2020)

  • Contract 1: Design, Real Estate, Procurement and Award by Dec 2021, Construction from 2022 - 2026
  • Contract 2: Design, Real Estate, Procurement and Award by April 2022, Construction from 2022 - 2025
  • Contract 3: Design, Real Estate, Procurement and Award by April 2022, Construction from 2022 - 2025
  • Contract 4: Design, Real Estate, Procurement and Award by Dec 2022, Construction from 2023 - 2027
  • Contract 5: Design, Real Estate, Procurement and Award by May 2023, Construction from 2023 - 2026
  • Contract 6: Design, Real Estate, Procurement and Award starting in 2021 and completed by June 2027, Construction from 2027 - 2032
  • Contract 7: Design, Real Estate, Procurement and Award starting in 2021 and completed by May 2026, Construction from 2026 - 2031

Antilles_Projects

Collapse All Expand All
 Flood Risk Management  

Map of Puerto Rico with numbered location of projects

  1. Rio Puerto Nuevo, San Juan - $1,552 million
  2. Rio de La Plata, Dorado, Toa Baja, and Toa Alta - $500 million
  3. Rio Grande de Arecibo, Arecibo - $82.9 million
  4. Rio Grande de Loiza, Gurabo and Caguas - $250 million
  5. Rio Guanajibo at Mayaguez, San German, Hormigueros and Mayaguez - $60 million
  6. Rio Nigua at Salinas, El Coco, Salinas and Playa de Salinas - $60 million
  7. Rio Culebrinas at Aguada and Aguadilla 
 Navigation - Removal of storm-induced shoaling and debris.

Map of Puerto Rico with numbered location of harbors

Puerto Rico

  1. Arecibo Harbor
  2. San Juan Harbor
  3. Mayaguez Harbor

U.S. Virgin Islands

  • Christiansted Harbor - St. Croix

 Continuing Authorities Program (CAP)

Map of Puerto Rico with numbered location of projects

  1. Loíza, Puerto Rico (CAP Section 14 - Emergency Streambank Protection)
  2. Salud Creek, Puerto Rico (CAP Section 14 - Emergency Streambank Protection)
  3. Río Antón Ruíz Restoration, Humacao, Puerto Rico (CAP Section 1135 - Project Modifications)
  4. Rio Descalabrado (CAP Section 205 - Flood Damage Reduction)
 Ecosystem Restoration

Caño Martin Peña