Project map
The Río Puerto Nuevo Basin drains 24 square miles, 75 percent of which is highly developed with a population of 250,000 persons. Rapid upstream runoff, inadequate channel capacity, constriction at bridges, and elimination of the flood plain by urbanization cause severe flooding to 7,500 residents, and 700 commercial and public structures valued at over $3 billion. The project includes six discreet project segments that will be constructed through separate contracts between now and 2032.

Download Image: Full Size (1.02 MB)
Photo by: Courtesy |  VIRIN: 200127-A-A1411-1001.JPG