Cutoff wall installation at Herbert Hoover Dike
A worker directs a "hydro-mill" into position while installing a partial cutoff wall in the Herbert Hoover Dike. The cutoff wall was installed in 21.4 miles of the dike from 2007-2013 to help reduce seepage through the earthen dam as part of a major rehabilitation project.