C-44 Reservoir and STA project
The intake canal and Citrus Boulevard Bridge was constructed as part of the Corps' first construction contract for the Indian River Lagoon-South C-44 Reservoir and Stormwater Treatment Area (STA) project, which was completed in July 2014.

Download Image: Full Size (0.44 MB)
Tags:
Photo by: Phillips & Jordan, Inc. |  VIRIN: 140717-A-CE999-100.JPG