Work continues at the Culvert 11 site near Port Mayaca to replace a water control structure in Herbert Hoover Dike
Work continues at the Culvert 11 site near Port Mayaca to replace a water control structure in Herbert Hoover Dike. Thirty-two structures, dating back to the 1930s, are scheduled to be removed, replaced or abandoned.