Brevard County, FL

May 2024

FACT SHEET

Brevard County, FL
Construction (C)
Congressional District: 8

1. DESCRIPTION

Brevard County is located on the east coast of Florida at the approximate midpoint of the peninsula. The authorized project has been divided into three segments: North Reach, South Reach and Mid-Reach. The North Reach consists of restoration of 9.4 miles of shoreline extending from the south jetty at Canaveral Harbor to the northern limit of Patrick Space Force Base (PSFB). The South Reach consists of restoration of 3.4 miles of shoreline and is bounded by PSFB to the north and Spessard Holland Park to the south. This section was originally 10.5 miles long, but 7.8 miles were excluded because of near shore hard bottom. The 7.8 miles that were excluded from the original report were studied and approved in a General Reevaluation Report (GRR) and are now referenced as the Mid-Reach. This segment was conditionally authorized by WRDA 2000 Section 418 and WRDA 2007 Section 3045.

2. FUNDING

Estimated Total Cost $728,000,000
Estimated Federal Cost        $397,900,000

   

a. Regular Civil Works Funds:

Allocation thru FY23             $86,410,000

   

b. P.L. 115-123: Bi-Partisan Budget Act of 2018, Supplemental (South Reach)

Current Working Estimate   $108,000
Allocation thru FY23 $108,000
Allocation for FY24 $0
FCCE:  
Current Working Estimate $12,000,000
Allocation thru FY23 $12,000,000
Allocation for FY24 $0

   

c. P.L. 116-20: Additional Supplemental Appropriations for Disaster Relief Act, 2019 (North Reach O&M):

Current Working Estimate   $6,100,000
Allocation thru FY23 $6,100,000

   

d. P.L. 117-58: Bi-Partisan Infrastructure Law:

Total Work Plan                   $7,800,000
Allocation thru FY23 $270,000
Allocation for FY24 $0

   

e. P.L. 117-43: Disaster Relief Supplemental Appropriations Act:

FCCE:  
Total Work Plan                  $15,700,000
Allocation thru FY23   $15,700,000
Allocation for FY24   $0

 

f. P.L. 117-328A: Division N 2023 DRSAA Funds:

Current Working Estimate  $4,000,000
Allocation thru FY23 $4,000,000
Allocation for FY24 $0
FCCE:  
Current Working Estimate $69,100,000
Allocation thru FY23 $69,100,000
Allocation for FY24 $0

    

3. SPONSOR

Brevard County Board of County Commissioners
2725 Judge Fran Jamieson Way
Viera, Florida 32940

4. STATUS

North Reach – Construction along 3.8 miles of the North Reach was completed in May 2021.  This contract placed a total of 472,526 cubic yards and was funded with O&M to fill the eroded template. Rehabilitation of the project is planned to be achieved by serving as the placement area for the next Canaveral Sand Bypass contract utilizing DRSAA funding starting in November 2024.

Mid-Reach and South Reaches – Initial construction of the Mid-Reach was completed in April 2020 and the last renourishment of the South Reach was completed in April 2021. A FCCE rehabilitation contract was awarded in Sep 2023 combining both the Mid-Reach and South Reach. Construction is ongoing and is estimated to place a total of 1.1 million cubic yard along both segments by April 2025.

 

Brevard County, Fl Construction Project