RPN Remaining

Collapse All Expand All
Expand List item 24316Collapse List item 24316  Supplemental Contract 1 

Sewer Line Relocation and Remaining Upper Margarita Channel (Sta 56+00 to Sta 89+60)

Expand List item 24317Collapse List item 24317  Supplemental Contract 2 

Roosevelt Bridge replacement

Expand List item 24318Collapse List item 24318  Supplemental Contract 3 

Channel Walls and Main Channel (Sta 88+33 to Sta 147+40).

Expand List item 24319Collapse List item 24319  Supplemental Contract 4 

Stilling Basin and Bridge Modifications of 4 Major Existing Bridges:
4A-1) Las Americas Expressway Bridge
4A-2) Piñero Avenue Bridge East
4A-3) NE Access Ramp Bridge
4A-4) SE Access Ramp Bridge

Expand List item 24320Collapse List item 24320  Supplemental Contract 5 

Bridge Replacement of Notre Dame Street Bridge and Piñero Avenue Bridge West.

Expand List item 24321Collapse List item 24321  Supplemental Contract 6 

Middle Main Channel - Sta. 147+40 to PR HWY 1 (Sta 240+00), 2 Buena Vista Bridge Replacement – Buena Vista Diversion Channel (Sta 0+00 to Sta. 42+37) and Construction of One Debris Basin.

Expand List item 24322Collapse List item 24322  Supplemental Contract 7 

Bridge Replacement of 10 Bridges, Quebrada Josefina (Piñero Avenue West Bridge South) Channel and Stilling Basins, Quebrada Doña Ana Channel and Stilling Basins.

Expand List item 24323Collapse List item 24323  Supplemental Contracts Implementation Schedule (As of Feb 2020)

  • Contract 1: Design, Real Estate, Procurement and Award by Dec 2021, Construction from 2022 - 2026
  • Contract 2: Design, Real Estate, Procurement and Award by April 2022, Construction from 2022 - 2025
  • Contract 3: Design, Real Estate, Procurement and Award by April 2022, Construction from 2022 - 2025
  • Contract 4: Design, Real Estate, Procurement and Award by Dec 2022, Construction from 2023 - 2027
  • Contract 5: Design, Real Estate, Procurement and Award by May 2023, Construction from 2023 - 2026
  • Contract 6: Design, Real Estate, Procurement and Award starting in 2021 and completed by June 2027, Construction from 2027 - 2032
  • Contract 7: Design, Real Estate, Procurement and Award starting in 2021 and completed by May 2026, Construction from 2026 - 2031

Antilles_Projects

Collapse All Expand All
Expand List item 24346Collapse List item 24346  Flood Risk Management  

Map of Puerto Rico with numbered location of projects

  1. Rio Puerto Nuevo, San Juan - $1,552 million
  2. Rio de La Plata, Dorado, Toa Baja, and Toa Alta - $500 million
  3. Rio Grande de Arecibo, Arecibo - $82.9 million
  4. Rio Grande de Loiza, Gurabo and Caguas - $250 million
  5. Rio Guanajibo at Mayaguez, San German, Hormigueros and Mayaguez - $60 million
  6. Rio Nigua at Salinas, El Coco, Salinas and Playa de Salinas - $60 million
  7. Rio Culebrinas at Aguada and Aguadilla 
Expand List item 24347Collapse List item 24347  Navigation - Removal of storm-induced shoaling and debris.

Map of Puerto Rico with numbered location of harbors

Puerto Rico

  1. Arecibo Harbor
  2. San Juan Harbor
  3. Mayaguez Harbor

U.S. Virgin Islands

  • Christiansted Harbor - St. Croix

Expand List item 24345Collapse List item 24345  Continuing Authorities Program (CAP)

Map of Puerto Rico with numbered location of projects

  1. Loíza, Puerto Rico (CAP Section 14 - Emergency Streambank Protection)
  2. Salud Creek, Puerto Rico (CAP Section 14 - Emergency Streambank Protection)
  3. Río Antón Ruíz Restoration, Humacao, Puerto Rico (CAP Section 1135 - Project Modifications)
  4. Rio Descalabrado (CAP Section 205 - Flood Damage Reduction)
Expand List item 24348Collapse List item 24348  Ecosystem Restoration

Caño Martin Peña