Public notices are now available on the U.S. Army Corps of Engineers’ Regulatory Request System (RRS). To view them, please follow this link:
https://rrs.usace.army.mil/rrs/public-notices

Public notices are published with only the vicinity map, plan view and cross-section drawing. If you are interested in receiving additional project drawings associated with any public notice, please send an email to the project manager at the email address listed in the public notice.

 

Public Notice Notifications

The Jacksonville District currently has four categories of public notice notification mailing lists. If you wish to receive email notifications when new public notices are added to this page, please send a request to Regulatory Webmaster.  Each category is described below. Be sure to specify which list(s) you want to be included on.

Florida - This includes all public notices for projects being reviewed for Standard Permits within the State of Florida.

Tropical Storms & Other Emergencies - These public notices provide information on procedures for emergency permitting requirements due to specific tropical storm events or other emergency situations.

Special Issues - These are public notices that involve the Regulatory program but which are generally not limited to one particular geographic area. These would include public notices for the establishment or modification of Restricted Areas/Danger Zones, re-issuance of General Permits or Nationwide Permits, changes to guidance and policies, etc.

Administrative Penalty - These public notices provide information associated with Administrative Penalties. An Administrative Penalty can be assessed to address violations associated with issued Department of the Army permits.

SAJ-2024-05258 (SP-MAO)

Jacksonville District
Published Sept. 24, 2025
Expiration date: 10/24/2025

TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and/or Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403). The purpose of this public notice is to solicit comments from the public regarding the work described below:

 

If you are interested in receiving additional project drawings associated with this public notice, please send an e-mail to the project manager by electronic mail at Michael.Ornella@usace.army.mil.

 

APPLICANT: Joanne Vernon, County Engineer

                          Charlotte County Public Works

                          7000 Florida Street

  Punta Gorda, FL 33950

 

WATERWAY AND LOCATION: The project would affect aquatic resources associated with the Rotonda River.  The project site is located at the bridge crossing of the Rotonda River on Rotonda Boulevard South on the south side of the Rotonda development “wheel”; at latitude 26.870893° and longitude –82.272400°; in Rotonda West, Charlotte County, Florida.

 

EXISTING CONDITIONS: The project site consists of an existing bridge and seawalls that have been undercut and destroyed by Hurricane Ian and conditions worsened by subsequent storm events. The bridge spans a river system that circles the Rotonda development and is fully contained with no outlets to downstream waters. A weir structure exists to the east of the bridge that separates the bridge from the rest of the river system. The site is comprised of waters that range from zero to four feet deep with no submerged aquatic vegetation present. The side slopes of the bridge span are unconsolidated sediments devoid of vegetation. The surrounding areas include residential homes to the east and undeveloped water management preserve to the west.

           

PROJECT PURPOSE:

 

Basic: Replacement of a damaged bridge.

 

Overall: Replacement of a storm damaged bridge in west Charlotte County.

 

PROPOSED WORK:  The applicant requests authorization to repair a storm damaged bridge by removing the existing piles, concrete slope pavement, and sheet pile wall and replacing the piles and extending the bridge and installing bedding stone and riprap to prevent bridge scour in the future. The project will involve the discharge of approximately 769 cubic yards of riprap over 15,734 square feet, 291 cubic yards of bedding stone, and 225 cubic yards of fill for the bridge piles.

 

AVOIDANCE AND MINIMIZATION: The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: The project is for the repair of a damaged bridge and all fill will be the minimum necessary to repair the bridge and prevent future safety issues resulting from storms. The project is located within a self-contained system and will not affect downstream waters.

 

COMPENSATORY MITIGATION: The applicant has provided the following explanation why compensatory mitigation should not be required: The project is within a self-contained river/canal and will not affect special aquatic sites.

 

CULTURAL RESOURCES:

The Corps evaluated the undertaking pursuant to Section 106 of the National Historic Preservation Act (NHPA) utilizing its existing program-specific regulations and procedures along with 36 CFR Part 800. The Corps’ program-specific procedures include 33 CFR 325, Appendix C, and revised interim guidance issued in 2005 and 2007, respectively. The District Engineer consulted district files and records and the latest published version of the National Register of Historic Places and initially determines that:

 

No resources listed in or eligible for inclusion in the National Register of Historic Places are known to be present in the vicinity of the proposed work; however, the permit area has not been formally surveyed for the presence of cultural resources. Additional work may be necessary to identify and assess any cultural resources that may be present. This notice serves as a request to SHPO, THPO, and/or other interested parties to provide any information they may have regarding historic properties.

 

The District Engineer’s final eligibility and effect determination will be based upon coordination with the SHPO and/or THPO, as appropriate and required, and with full consideration given to the proposed undertaking’s potential direct and indirect effects on historic properties within the Corps-identified permit area.

 

ENDANGERED SPECIES: The Corps has performed an initial review of the application, using the U.S. Fish and Wildlife Service (USFWS) Information for Planning and Consultation (IPaC) to determine if any threatened, endangered, proposed, or candidate species, as well as the proposed and final designated critical habitat may occur in the vicinity of the proposed project. Based on this initial review, the Corps has made a preliminary determination that the proposed project may affect species and critical habitat listed below. No other ESA-listed species or critical habitat will be affected by the proposed action.

 

Table 1: ESA-listed species and/or critical habitat potentially present in the action area.

Species Common Name and/or Critical Habitat Name

Scientific Name

Federal Status

Wood Stork

Mycteria americana

Threatened

Florida Bonneted Bat

Eumops floridanus

Endangered

 

Pursuant to Section 7 ESA, any required consultation with the Service(s) will be conducted in accordance with 50 CFR part 402. The USFWS is the lead Federal agency for ESA consultation for the proposed action. Any required consultation will be completed by USFWS.

 

This notice serves as request to the U.S. Fish and Wildlife Service for any additional information on whether any listed or proposed to be listed endangered or threatened species or critical habitat may be present in the area which would be affected by the proposed activity.

 

ESSENTIAL FISH HABITAT: Pursuant to the Magnuson-Stevens Fishery Conservation and Management Act 1996, the Corps reviewed the project area, examined information provided by the applicant, and consulted available species information.

 

The Corps has determined the proposal would have no effect on any Essential Fish Habitat (EFH). The proposed project is located within a self-contained river/canal and does not have EFH present, nor would it affect downstream waters. Therefore, no consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996 is required.

 

NAVIGATION: The proposed structure or activity is not located in the vicinity of a federal navigation channel.

 

SECTION 408: The applicant will require permission under Section 14 of the Rivers and Harbors Act of 1899 (33 USC 408) because the activity, in whole or in part,   would not alter, occupy, or use a Corps Civil Works project.

 

WATER QUALITY CERTIFICATION: Water Quality Certification may be required from the South Florida Water Management District.

 

COASTAL ZONE MANAGEMENT CONSISTENCY: Coastal Zone Consistency Concurrence is required from the South Florida Water Management District. In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan.

 

NOTE:  This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The geographic extent of aquatic resources within the proposed project area that either are, or are presumed to be, within the Corps jurisdiction has not been verified by Corps personnel.

 

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.

 

COMMENTS: The Corps is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment (EA) and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act (NEPA). Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

 

The Jacksonville District will receive written comments on the proposed work, as outlined above, until October 24, 2025. Comments should be submitted electronically via the Regulatory Request System (RRS) at https://rrs.usace.army.mil/rrs/public-notices or to Michael Ornella at Michael.Ornella@usace.army.mil. Alternatively, you may submit comments in writing to the Commander, U.S. Army Corps of Engineers, Jacksonville District, Attention:  Michael Ornella II, 701 San Marco Boulevard, Jacksonville, FL 32207.  Please refer to the permit application number in your comments.

 

Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider the application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. Requests for a public hearing will be granted, unless the District Engineer determines that the issues raised are insubstantial or there is otherwise no valid interest to be served by a hearing.

TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and/or Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403). The purpose of this public notice is to solicit comments from the public regarding the work described below:

 

If you are interested in receiving additional project drawings associated with this public notice, please send an e-mail to the project manager by electronic mail at Michael.Ornella@usace.army.mil.

 

APPLICANT: Joanne Vernon, County Engineer

                          Charlotte County Public Works

                          7000 Florida Street

  Punta Gorda, FL 33950

 

WATERWAY AND LOCATION: The project would affect aquatic resources associated with the Rotonda River.  The project site is located at the bridge crossing of the Rotonda River on Rotonda Boulevard South on the south side of the Rotonda development “wheel”; at latitude 26.870893° and longitude –82.272400°; in Rotonda West, Charlotte County, Florida.

 

EXISTING CONDITIONS: The project site consists of an existing bridge and seawalls that have been undercut and destroyed by Hurricane Ian and conditions worsened by subsequent storm events. The bridge spans a river system that circles the Rotonda development and is fully contained with no outlets to downstream waters. A weir structure exists to the east of the bridge that separates the bridge from the rest of the river system. The site is comprised of waters that range from zero to four feet deep with no submerged aquatic vegetation present. The side slopes of the bridge span are unconsolidated sediments devoid of vegetation. The surrounding areas include residential homes to the east and undeveloped water management preserve to the west.

           

PROJECT PURPOSE:

 

Basic: Replacement of a damaged bridge.

 

Overall: Replacement of a storm damaged bridge in west Charlotte County.

 

PROPOSED WORK:  The applicant requests authorization to repair a storm damaged bridge by removing the existing piles, concrete slope pavement, and sheet pile wall and replacing the piles and extending the bridge and installing bedding stone and riprap to prevent bridge scour in the future. The project will involve the discharge of approximately 769 cubic yards of riprap over 15,734 square feet, 291 cubic yards of bedding stone, and 225 cubic yards of fill for the bridge piles.

 

AVOIDANCE AND MINIMIZATION: The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: The project is for the repair of a damaged bridge and all fill will be the minimum necessary to repair the bridge and prevent future safety issues resulting from storms. The project is located within a self-contained system and will not affect downstream waters.

 

COMPENSATORY MITIGATION: The applicant has provided the following explanation why compensatory mitigation should not be required: The project is within a self-contained river/canal and will not affect special aquatic sites.

 

CULTURAL RESOURCES:

The Corps evaluated the undertaking pursuant to Section 106 of the National Historic Preservation Act (NHPA) utilizing its existing program-specific regulations and procedures along with 36 CFR Part 800. The Corps’ program-specific procedures include 33 CFR 325, Appendix C, and revised interim guidance issued in 2005 and 2007, respectively. The District Engineer consulted district files and records and the latest published version of the National Register of Historic Places and initially determines that:

 

No resources listed in or eligible for inclusion in the National Register of Historic Places are known to be present in the vicinity of the proposed work; however, the permit area has not been formally surveyed for the presence of cultural resources. Additional work may be necessary to identify and assess any cultural resources that may be present. This notice serves as a request to SHPO, THPO, and/or other interested parties to provide any information they may have regarding historic properties.

 

The District Engineer’s final eligibility and effect determination will be based upon coordination with the SHPO and/or THPO, as appropriate and required, and with full consideration given to the proposed undertaking’s potential direct and indirect effects on historic properties within the Corps-identified permit area.

 

ENDANGERED SPECIES: The Corps has performed an initial review of the application, using the U.S. Fish and Wildlife Service (USFWS) Information for Planning and Consultation (IPaC) to determine if any threatened, endangered, proposed, or candidate species, as well as the proposed and final designated critical habitat may occur in the vicinity of the proposed project. Based on this initial review, the Corps has made a preliminary determination that the proposed project may affect species and critical habitat listed below. No other ESA-listed species or critical habitat will be affected by the proposed action.

 

Table 1: ESA-listed species and/or critical habitat potentially present in the action area.

Species Common Name and/or Critical Habitat Name

Scientific Name

Federal Status

Wood Stork

Mycteria americana

Threatened

Florida Bonneted Bat

Eumops floridanus

Endangered

 

Pursuant to Section 7 ESA, any required consultation with the Service(s) will be conducted in accordance with 50 CFR part 402. The USFWS is the lead Federal agency for ESA consultation for the proposed action. Any required consultation will be completed by USFWS.

 

This notice serves as request to the U.S. Fish and Wildlife Service for any additional information on whether any listed or proposed to be listed endangered or threatened species or critical habitat may be present in the area which would be affected by the proposed activity.

 

ESSENTIAL FISH HABITAT: Pursuant to the Magnuson-Stevens Fishery Conservation and Management Act 1996, the Corps reviewed the project area, examined information provided by the applicant, and consulted available species information.

 

The Corps has determined the proposal would have no effect on any Essential Fish Habitat (EFH). The proposed project is located within a self-contained river/canal and does not have EFH present, nor would it affect downstream waters. Therefore, no consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996 is required.

 

NAVIGATION: The proposed structure or activity is not located in the vicinity of a federal navigation channel.

 

SECTION 408: The applicant will require permission under Section 14 of the Rivers and Harbors Act of 1899 (33 USC 408) because the activity, in whole or in part,   would not alter, occupy, or use a Corps Civil Works project.

 

WATER QUALITY CERTIFICATION: Water Quality Certification may be required from the South Florida Water Management District.

 

COASTAL ZONE MANAGEMENT CONSISTENCY: Coastal Zone Consistency Concurrence is required from the South Florida Water Management District. In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan.

 

NOTE:  This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The geographic extent of aquatic resources within the proposed project area that either are, or are presumed to be, within the Corps jurisdiction has not been verified by Corps personnel.

 

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.

 

COMMENTS: The Corps is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment (EA) and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act (NEPA). Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

 

The Jacksonville District will receive written comments on the proposed work, as outlined above, until October 24, 2025. Comments should be submitted electronically via the Regulatory Request System (RRS) at https://rrs.usace.army.mil/rrs/public-notices or to Michael Ornella at Michael.Ornella@usace.army.mil. Alternatively, you may submit comments in writing to the Commander, U.S. Army Corps of Engineers, Jacksonville District, Attention:  Michael Ornella II, 701 San Marco Boulevard, Jacksonville, FL 32207.  Please refer to the permit application number in your comments.

 

Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider the application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. Requests for a public hearing will be granted, unless the District Engineer determines that the issues raised are insubstantial or there is otherwise no valid interest to be served by a hearing.

TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and/or Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403). The purpose of this public notice is to solicit comments from the public regarding the work described below:

 

If you are interested in receiving additional project drawings associated with this public notice, please send an e-mail to the project manager by electronic mail at Michael.Ornella@usace.army.mil.

 

APPLICANT: Joanne Vernon, County Engineer

                          Charlotte County Public Works

                          7000 Florida Street

  Punta Gorda, FL 33950

 

WATERWAY AND LOCATION: The project would affect aquatic resources associated with the Rotonda River.  The project site is located at the bridge crossing of the Rotonda River on Rotonda Boulevard South on the south side of the Rotonda development “wheel”; at latitude 26.870893° and longitude –82.272400°; in Rotonda West, Charlotte County, Florida.

 

EXISTING CONDITIONS: The project site consists of an existing bridge and seawalls that have been undercut and destroyed by Hurricane Ian and conditions worsened by subsequent storm events. The bridge spans a river system that circles the Rotonda development and is fully contained with no outlets to downstream waters. A weir structure exists to the east of the bridge that separates the bridge from the rest of the river system. The site is comprised of waters that range from zero to four feet deep with no submerged aquatic vegetation present. The side slopes of the bridge span are unconsolidated sediments devoid of vegetation. The surrounding areas include residential homes to the east and undeveloped water management preserve to the west.

           

PROJECT PURPOSE:

 

Basic: Replacement of a damaged bridge.

 

Overall: Replacement of a storm damaged bridge in west Charlotte County.

 

PROPOSED WORK:  The applicant requests authorization to repair a storm damaged bridge by removing the existing piles, concrete slope pavement, and sheet pile wall and replacing the piles and extending the bridge and installing bedding stone and riprap to prevent bridge scour in the future. The project will involve the discharge of approximately 769 cubic yards of riprap over 15,734 square feet, 291 cubic yards of bedding stone, and 225 cubic yards of fill for the bridge piles.

 

AVOIDANCE AND MINIMIZATION: The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: The project is for the repair of a damaged bridge and all fill will be the minimum necessary to repair the bridge and prevent future safety issues resulting from storms. The project is located within a self-contained system and will not affect downstream waters.

 

COMPENSATORY MITIGATION: The applicant has provided the following explanation why compensatory mitigation should not be required: The project is within a self-contained river/canal and will not affect special aquatic sites.

 

CULTURAL RESOURCES:

The Corps evaluated the undertaking pursuant to Section 106 of the National Historic Preservation Act (NHPA) utilizing its existing program-specific regulations and procedures along with 36 CFR Part 800. The Corps’ program-specific procedures include 33 CFR 325, Appendix C, and revised interim guidance issued in 2005 and 2007, respectively. The District Engineer consulted district files and records and the latest published version of the National Register of Historic Places and initially determines that:

 

No resources listed in or eligible for inclusion in the National Register of Historic Places are known to be present in the vicinity of the proposed work; however, the permit area has not been formally surveyed for the presence of cultural resources. Additional work may be necessary to identify and assess any cultural resources that may be present. This notice serves as a request to SHPO, THPO, and/or other interested parties to provide any information they may have regarding historic properties.

 

The District Engineer’s final eligibility and effect determination will be based upon coordination with the SHPO and/or THPO, as appropriate and required, and with full consideration given to the proposed undertaking’s potential direct and indirect effects on historic properties within the Corps-identified permit area.

 

ENDANGERED SPECIES: The Corps has performed an initial review of the application, using the U.S. Fish and Wildlife Service (USFWS) Information for Planning and Consultation (IPaC) to determine if any threatened, endangered, proposed, or candidate species, as well as the proposed and final designated critical habitat may occur in the vicinity of the proposed project. Based on this initial review, the Corps has made a preliminary determination that the proposed project may affect species and critical habitat listed below. No other ESA-listed species or critical habitat will be affected by the proposed action.

 

Table 1: ESA-listed species and/or critical habitat potentially present in the action area.

Species Common Name and/or Critical Habitat Name

Scientific Name

Federal Status

Wood Stork

Mycteria americana

Threatened

Florida Bonneted Bat

Eumops floridanus

Endangered

 

Pursuant to Section 7 ESA, any required consultation with the Service(s) will be conducted in accordance with 50 CFR part 402. The USFWS is the lead Federal agency for ESA consultation for the proposed action. Any required consultation will be completed by USFWS.

 

This notice serves as request to the U.S. Fish and Wildlife Service for any additional information on whether any listed or proposed to be listed endangered or threatened species or critical habitat may be present in the area which would be affected by the proposed activity.

 

ESSENTIAL FISH HABITAT: Pursuant to the Magnuson-Stevens Fishery Conservation and Management Act 1996, the Corps reviewed the project area, examined information provided by the applicant, and consulted available species information.

 

The Corps has determined the proposal would have no effect on any Essential Fish Habitat (EFH). The proposed project is located within a self-contained river/canal and does not have EFH present, nor would it affect downstream waters. Therefore, no consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996 is required.

 

NAVIGATION: The proposed structure or activity is not located in the vicinity of a federal navigation channel.

 

SECTION 408: The applicant will require permission under Section 14 of the Rivers and Harbors Act of 1899 (33 USC 408) because the activity, in whole or in part,   would not alter, occupy, or use a Corps Civil Works project.

 

WATER QUALITY CERTIFICATION: Water Quality Certification may be required from the South Florida Water Management District.

 

COASTAL ZONE MANAGEMENT CONSISTENCY: Coastal Zone Consistency Concurrence is required from the South Florida Water Management District. In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan.

 

NOTE:  This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The geographic extent of aquatic resources within the proposed project area that either are, or are presumed to be, within the Corps jurisdiction has not been verified by Corps personnel.

 

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.

 

COMMENTS: The Corps is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment (EA) and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act (NEPA). Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

 

The Jacksonville District will receive written comments on the proposed work, as outlined above, until October 24, 2025. Comments should be submitted electronically via the Regulatory Request System (RRS) at https://rrs.usace.army.mil/rrs/public-notices or to Michael Ornella at Michael.Ornella@usace.army.mil. Alternatively, you may submit comments in writing to the Commander, U.S. Army Corps of Engineers, Jacksonville District, Attention:  Michael Ornella II, 701 San Marco Boulevard, Jacksonville, FL 32207.  Please refer to the permit application number in your comments.

 

Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider the application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. Requests for a public hearing will be granted, unless the District Engineer determines that the issues raised are insubstantial or there is otherwise no valid interest to be served by a hearing.

Click here for public notice and graphics