Jacksonville District Header Image

JACKSONVILLE DISTRICT

Home
Home > Missions > Civil Works > Review Plans

Review Plans

Collapse All Expand All

FY-2014 Review Plans

Seminole Big Cypress Reservation, Water Control Manual, Basins 1, 2, and 4
Seminole Big Cypress Reservation, WCM, Basins 1, 2, and 4 approval, 25 Nov 2013

FY-2013 Review Plans

Banana River Estuary Restoration Project
Banana River Estuary Restoration Project, Approval Memo, 29 April 2013
Broward County, Segment 2, LRR
Broward County, Segment 2, Approval Memo
Broward County (Segment II), Florida FCCE Review Plan
Cano Martin Pena
Cano Martin Pena Approval Memo
Dade County Beach Erosion Control and Hurricane Protection, LRR
Dade County Beach Erosion Control and Hurricane Protection, LRR Approval Memo
Dade County Beach Erosion Control LRR, Revised Review Plan
Fort Pierce Beach Shore Protection Project Review Plan
Indian River Lagoon South (IRLS) C-44 Review Plan 17-DEC-2012
Jacksonville Harbor General Reevaluation Report (GRR2)
Jacksonville Harbor O&M, Dredged Material Management Plan
Kissimmee River Restoration Project, Contract 15A, River Acres Supplemental Work
Lake Worth Inlet, Palm Beach Harbor, Feasibility Study
Lake Worth Inlet, Palm Beach Harbor, Approval Memo
Lower Hillsborough and Tampa Bypass Canal Master Water Control Manual
Lower Hillsborough and Tampa Bypass Canal MWCP Approval Memo
Manatee County LRR
Manatee County LRR Approval Memo
Modified Water Deliveries, Letter Report to Assess Competion Satus
Modified Water Deliveries, Letter Report Approval Memo, 12 April 20013
Palm Beach County, Jupiter Carlin, Section 934 Study
Palm Beach County, Jupiter Carlin Approval Memo
Palm Beach County, Ocean Ridge LRR
Palm Beach County, Ocean Ridge Approval Memo
Picayune Strand PAC LRR
Picayune Strand Approval Memo
Pinellas and Lee County Hurricane and Storm Damage Reduction Review Plans
Programmatic Review Plan for Routine O&M Products
Rio Puerto Nuevo, PR, Review Plan
Rio Grande de Arecibo, Post Authorization Change Report
Rio Grande de Arecibo, PACR, Approval Memo, 2 May 2013
Rio Puerto Nuevo, Post Authorization Change Report
Rio Puerto Nuevo, PAC, Approval Memo, 17 May 2013
San Juan Harbor LRR, Mitigation
San Juan Harbor LRR, Review Plan Approval, 30 May 2013
Seminole Big Cypress Reservation, Water Control Plan and EA, 1 Oct 12
Seminole Big Cypress Reservation, Water Control Plan, Approval Memo
Stormwater Treatment Area STA 1E (C&SF: West Palm Beach Canal C-51) Letter Report
Stormwater Treatment Area STA 1E Approval Memo, 8 Apr 2013
Upper St. Johns River Three Forks Marsh Conservation Review Plan

FY-2012 Review Plans

Broward County Water Preserve Area
Broward County Water Preserve Area Approval Memo
C-111 South Dade, Contract 8
Canaveral Harbor Sec 203
Canaveral Harbor Sec 203 Approval Memo
Cedar Hammock (Wares Creek)
Central Everglades Planning Project
Central Everglades Planning Project Approval Memo
Dade County SMART Structures
Everglades Restoration Transition Plan, Revisions to Water Control Plan (ENP) and EIS
Herbert Hoover Dike, Design and Construction, 2nd Revision
Herbert Hoover Dike, Pilot Test Letter Report, Plans and Specs
Jacksonville Harbor, Mile Point, PED Phase
Kissimmee River Restoration, Contract 10, PED Phase
Lake Okeechobee Aquifer Storage and Recovery (ASR) Pilot Project Review Plan
Martin County Shore Protection, Periodic Renourishment Implementation Docs
Sarasota County, Venice Beach, LRR
STA-1E, PSTA Decommissioning Project and EA
Tarpon Springs, Whitcomb and Kreamer Bayous, CAP 103
Water Control Area 3 Decompartmentalization Physical Model Approval

FY-2011 Review Plans

8.5 Square Mile Area Project, Interim Operating Criteria and EA
Big Fishweir Creek, CAP Section 206
Duval County Beach Erosion Control, Periodic Renourishment Implementation Docs
Everglades Restoration Plan
Ft. Pierce Beach Shore Protection, Implementation Documents
Kissimmee River Restoration Project, Contract 12, S-65EX1 Structure, Intermediate Phase, P&S and DDR
Kissimmee River Restoration, C-38 Reach 3 Backfill and Bass Levee Degrade, PED
Kissimmee River Restoration, Limited Reevaluation Report (LRR)
Martin County Shore Protection Review Plan
Martin County Shore Protection Review Plan Approval
Martin County Shore Protection Type 1 IEPR Exclusion
Miami Harbor Deepening & Widening (PhaseIII)
Picayune Strand Restoration, Design and Construction Phases
Pinellas County, Beach Erosion Control
Regional O&M Review Plan
Seminole Big Cypress Reservation, Interim Water Control Plan and EA
St. Johns County Shore Protection, Periodic Renourishment Implementation Documents
STA-1E Modifications, Culverts and Trash RAke Systems, Decision Doument
STA-1E Modifications, Culverts and Trash Rake Systems
STA-1E Modifications, Culverts and Trash Rake Systems, Review Plan Approval
STA-1E Modifications, Culverts and Trash Rake Systems, IEPR Exclusion
Tampa Harbor GRR
Tampa Harbor Dredged Material Management Plan, 2010-2030 Update


FY-2010 Review Plans

Broward County, Segment 1, Shore Protection
Flagler County Shore Protection Feasibility Study
Kissimmee River Restoration Post-Authorization Change, LRR
Port Everglades Feasibility Study, May 2010 Update
Rio de la Plata, Flood Control 
St. Johns County Feasibility Study, May 2010 Update
WCA 3A Decompartmentalization

FY-2009 Review Plans

Biscayne Bay Coastal Wetlands
C-111 Spreader Canal
Ft. Pierce, St. Lucie County, Shore Protection, GRR
St. Lucie Hurricane and Storm Damage Reduction Feasibility Study and EIS

FY-2008 Review Plans

Brevard County Shore Protection Mid Reach GRR
Indian River Lagoon North (IRL-N) Feasibility Study
Jacksonville Harbor GRR, Phase 2
Jacksonville Harbor, Mile Point Feasibility Study
Port Everglades Feasibility Study
St. Johns County Feasibility Study