Public notices are now available on the U.S. Army Corps of Engineers’ Regulatory Request System (RRS). To view them, please follow this link:
https://rrs.usace.army.mil/rrs/public-notices

Public notices are published with only the vicinity map, plan view and cross-section drawing. If you are interested in receiving additional project drawings associated with any public notice, please send an email to the project manager at the email address listed in the public notice.

 

Public Notice Notifications

The Jacksonville District currently has four categories of public notice notification mailing lists. If you wish to receive email notifications when new public notices are added to this page, please send a request to Regulatory Webmaster.  Each category is described below. Be sure to specify which list(s) you want to be included on.

Florida - This includes all public notices for projects being reviewed for Standard Permits within the State of Florida.

Tropical Storms & Other Emergencies - These public notices provide information on procedures for emergency permitting requirements due to specific tropical storm events or other emergency situations.

Special Issues - These are public notices that involve the Regulatory program but which are generally not limited to one particular geographic area. These would include public notices for the establishment or modification of Restricted Areas/Danger Zones, re-issuance of General Permits or Nationwide Permits, changes to guidance and policies, etc.

Administrative Penalty - These public notices provide information associated with Administrative Penalties. An Administrative Penalty can be assessed to address violations associated with issued Department of the Army permits.

Results:
Tag: Pinellas County
Clear
  • SAJ-2014-02681

    Expiration date: 8/5/2018

    Pinellas County. City of St. Petersburg. St. Petersburg, Florida. PROJECT PURPOSE: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received a complete prospectus proposing the establishment of a mitigation bank pursuant to the 2008 Compensatory Mitigation for Losses of Aquatic Resources regulations (33 CFR Part 332)

  • SAJ-2011-02369 (SP-JED)

    Expiration date: 7/2/2018

    Pinellas County. Florida Department of Environmental Protection. Tallahassee, FL. PROJECT PURPOSE: Basic: The basic project purpose is shoreline stabilization. Overall: The overall project purpose is dredging to obtain suitable fill material to perform beach and dune renourishment to stabilize the of Honeymoon Island shoreline.

  • SAJ-2017-02765 (SP-RGH)

    Expiration date: 2/27/2018

    Pinellas County Board of County Commissioners. Clearwater, Florida. PROJECT PURPOSE: Basic: Stormwater Improvement. Overall: Improvement of an existing stormwater conveyance system to fix frequent flooding caused by inadequate culverts and proper access for maintenance.

  • SAJ-2009-1024 (SP-PTR)

    Expiration date: 11/3/2017

    Pinellas County. CRP II – Tarpon Springs, LLC. Tampa, Florida. PROJECT PURPOSE: Basic: Construction of a multi-family residential development. Overall: Construction of a multi-family residential development to include 236 garden-style apartment units in 5 buildings with approx. 390 parking spaces, appropriate ingress and egress, a surface water management system, supporting infrastructure and two (2) mixed use, Retail/Commercial outparcels located in north Pinellas County.

  • SAJ-2003-03603 (SP-JED)

    Expiration date: 7/1/2017

    Pinellas County. Causeway Village MHC, LLC. Skokie, Illinois. PROJECT PURPOSE: Basic: The basic project purpose is to provide access to navigable water. Overall: The overall project purpose is to increase the available slip space available for an existing marina on Boca Ciega Bay.