Results:
Tag: Canaveral Lock
Clear
  • July

    New pilings at Canaveral Lock a win-win

    The new pilings being driven into place at the Canaveral Lock are a win-win. Not only are they more environmentally friendly than traditional pilings, but they are expected to last longer and save money in the end.
  • January

    Operations Division overcomes challenges

    “2013 was a year full of challenges,” said Jim Jeffords, Operations Division chief. “Our biggest challenge was the historical rain event that occurred from April to July. The event tested all aspects of the district – our water managers, inspections of the dike, emergency operations, dam safety and corporate communications.”