Sand Placement Map for Venice GIWW Project October 2019
Map showing the placement location of sand from the maintenance dredging project in Venice, Florida, that will take place in October 2019. The project will take sand removed from the Intracoastal Waterway and place it on eroded areas of the beach and in the near shore area to protect structures and infrastructure on the public beach.

Download Image: Full Size (1.27 MB)
Tags:
Photo by: Jacksonville District Engineering |  VIRIN: 191001-A-A1411-1011.PNG