140814-A-GB172-107
With Tampa in the distance, dike construction continues at 3-D to increase its capacity to 15-million cubic yards for use in disposing Tampa Harbor Project dredged materials.

Download Image: Full Size (2.32 MB)
Tags:
Photo by: Susan J. Jackson |  VIRIN: 140814-A-GB172-107.JPG