130605-A-CE999-050
Rehabilitation work continues at Herbert Hoover Dike, with the replacement of more than 30 water control structures around the lake, similar to the Culvert 11 site pictured above. Jacksonville District plans to continue work to replace these structures through 2018.

Download Image: Full Size (0.27 MB)
Photo by: USACE File photo |  VIRIN: 130605-A-CE999-050.JPG