May 2025
FACT SHEET
Brevard County, FL
Construction (C)
Congressional District: 8
1. DESCRIPTION
Brevard County is located on the east coast of Florida at the approximate midpoint of the peninsula. The authorized project has been divided into three segments: North Reach, South Reach and Mid-Reach. The North Reach consists of restoration of 9.4 miles of shoreline extending from the south jetty at Canaveral Harbor to the northern limit of Patrick Space Force Base (PSFB). The South Reach consists of restoration of 3.8 miles of shoreline and is bounded by PSFB to the north and Spessard Holland Park to the south. This section was originally 10.5 miles long, but 7.8 miles were excluded because of near shore hard bottom. The 7.8 miles that were excluded from the original report were studied and approved in a General Reevaluation Report (GRR) and are now referenced as the Mid-Reach. This segment was conditionally authorized by WRDA 2000 Section 418 and WRDA 2007 Section 3045.
2. FUNDING
Estimated Total Cost |
$911,800,000 |
Estimated Federal Cost |
$397,900,000 |
a. Regular Civil Works Funds:
Allocation thru FY24 |
$86,630,000 |
b. P.L. 115-123: Bi-Partisan Budget Act of 2018, Supplemental (South Reach)
Current Working Estimate |
$200,000 |
Allocation thru FY24 |
$108,000 |
Allocation for FY25 |
$0 |
FCCE: |
|
Current Working Estimate |
$12,000,000 |
Allocation thru FY24 |
$12,000,000 |
Allocation for FY25 |
$0 |
c. P.L. 116-20: Additional Supplemental Appropriations for Disaster Relief Act, 2019 (North Reach O&M):
Current Working Estimate |
$6,100,000 |
Allocation thru FY24 |
$6,103,000 |
d. P.L. 117-58: Infrastructure Investment and Jobs Act:
Total Work Plan |
$7,800,000 |
Estimated Federal Cost |
$7,800,000 |
Allocation thru FY24 |
$270,000 |
Allocation for FY25 |
$0 |
e. P.L. 117-43: Disaster Relief Supplemental Appropriations Act:
FCCE: |
|
Total Work Plan |
$15,700,000 |
Estimated Federal Cost |
$15,700,000 |
Allocation thru FY24 |
$15,700,000 |
Allocation for FY25 |
$0 |
f. P.L. 117-328A: Division N 2023 DRSAA Funds:
Current Working Estimate |
$4,000,000 |
Allocation thru FY24 |
$4,000,000 |
Allocation for FY25 |
$0 |
FCCE: |
|
Current Working Estimate |
$69,100,000 |
Allocation thru FY24 |
$69,142,000 |
Allocation for FY25 |
$0 |
3. SPONSOR
Brevard County Board of County Commissioners
2725 Judge Fran Jamieson Way
Viera, Florida 32940
4. STATUS
North Reach – Construction of the project is being achieved by serving as the placement area for the ongoing Canaveral Sand Bypass contract scheduled for completion by May 2026. Once complete, the contract will place an estimated 1,500,000 cubic yards within the authorized limits and is funded with DRSAA appropriations.
Mid-Reach and South Reaches – A FCCE rehabilitation contract was awarded in September 2023 combining both the Mid-Reach and South Reach. Construction of the Mid-Reach portion of the contract was completed in March 2025 having placed a total of 367,030 cubic yards. Construction of the South Reach is currently scheduled to start in November 2025 and be completed no later than April 2026.