Mayport (NAVY O&M)

April 2022

FACT SHEET
Mayport (NAVY O&M)
Operations and Maintenance
Congressional Districts: 3, 4, 5

 

1. DESCRIPTION

The work consists of maintenance dredging the 50 foot Entrance Channel to include Bar Cut 3, and non-50 foot portions including the Turning Basin, Destroyer Slip, and Small Boat Basin at the U.S. Naval Station (NS) Mayport, Florida.

2. FUNDING

Allocation for FY22 (Navy) $875,000
President’s Budget FY23 $18,169,000

 

3. SPONSOR

U.S. Navy
Naval Station Mayport
Mayport, FL 32228

4. STATUS

Approximately 1,400,000 cubic yards is maintenance dredged once every two years. The last maintenance dredging event was completed in FY21. All material resulting from this work was transported to and placed in the Jacksonville ODMDS. The FY23 maintenance dredging was awarded in November 2022; dredging is scheduled to be completed by September 2023.

Mayport Navy Operations and Maintenance 50 Foot project map              Mayport Navy Operations and Maintenance non-50 foot dredging project map