US Army Corps of Engineers
Jacksonville District

Naples to Big Marco Pass FL (O&M)

March 2018

FACT SHEET

Naples to Big Marco Pass FL (O&M)

Operations & Maintenance

Congressional Districts: 19, 25
 

1. DESCRIPTION

The project includes the southerly 10.15 miles of the waterway from Naples to Big Marco Pass and 4.5 miles of waterway from Naples to Gordon Pass. An interior channel 6 x 70 feet from southerly limits of the town of Naples to Big Marco Pass; a channel 12 x 150 feet from that depth in the Gulf to Gordon Pass, thence 10 x 100 feet through Gordon Pass and Naples Bay to a point 400 feet south of the U.S. 41 highway bridge, thence 10 x 70 feet to the bridge; and a turning basin 8 x 150 x 200 feet in upper Naples Bay; and a turning basin 8 x 250 x 670 feet at the municipal yacht basin.
 

2. FUNDING

a. Regular Civil Works Funds:

Allocation for FY19 $0
President's Budget for FY20 $0

 

b. P.L. 115-123: Bi-Partisan Budget Act of 2018, Supplemental:

Current Working Estimate

$400,000

Allocation thru FY18

Allocation for FY19

  $150,000

 $250,000

 

3. SPONSOR

Collier County
3300 Santa Barbara Blvd.
Naples, Florida 34116 

4. STATUS

Project was completed in 2016 for cuts 1, 3, and 4 to the authorized project depth by removing 80,000 cubic yards of material from the Federal channel and placed on the beach at Keewaydin Island. The Jacksonville District continues to perform project condition surveys of the Federal channel. Project was placed on hold due to Bi-Partisan Budget Act of 2018 supplemental funding being rescinded. There is approximately $100k in funding available that can be used to add an additional placement site north of the Inlet. Could be a placement option if funding is restored next FY. BCOE Certification was not completed and the project schedule was revised to push it out to FY20.

 

Naples to Big Marco Pass Operations and Maintenance project map