Results:
Tag: Lake O
Clear
  • USACE announces availability of the Final Draft LOSOM Water Control Plan and Project Delivery Team Meeting and Listening Session on July 24

    The U.S. Army Corps of Engineers, Jacksonville District announces the availability of the Final Draft Lake Okeechobee System Operating Manual (LOSOM) Water Control Plan and a virtual LOSOM Project Delivery Team (PDT) Meeting and listening session scheduled for Monday, July 24, from 10 a.m. to 11:30 a.m.
  • USACE increases target flows from Lake Okeechobee to the Caloosahatchee Estuary

    The U.S. Army Corps of Engineers (USACE) Jacksonville District will increase releases from Lake Okeechobee to the Caloosahatchee River Estuary beginning Saturday, June 10. The releases to the Caloosahatchee River Estuary will target a pulse release at a 7-day average of 2,000 cubic feet per second (cfs) from the W.P. Franklin Lock and Dam (S-79). This is a slight increase from the 1,800 cfs targeted pulse release that has been in effect since April 15. Since this target is measured at the W.P. Franklin Lock and Dam (S-79), it includes local basin runoff and may require flows at S-79 to temporarily go above the target release to maintain flood control along the C-43 Canal.
  • USACE reduces target flows from Lake Okeechobee

    The U.S. Army Corps of Engineers Jacksonville District will reduce releases from Lake Okeechobee to the St. Lucie and Caloosahatchee River Estuaries beginning Saturday, April 15.
  • Lake Okeechobee releases planned for Sediment Study on February 21 through 24

    The U.S. Army Corps of Engineers (USACE) Jacksonville District plans to execute a minor adjustment to the current lake release schedule from Tuesday, February 21 through Friday, February 24, that will release water from Lake Okeechobee as part of an ongoing sediment study by the South Florida Water Management District (SFWMD) and the U.S. Geological Survey (USGS).
  • USACE marks Herbert Hoover Dike Rehabilitation project completion with Ribbon Cutting Ceremony

    CLEWISTION, Fla.-The U.S. Army Corps of Engineers Jacksonville District hosted a ribbon-cutting ceremony to celebrate completion of construction for the Herbert Hoover Dike Rehabilitation project.
  • Lake Okeechobee releases planned for Sediment Study on August 23

    The U.S. Army Corps of Engineers (USACE) Jacksonville District plans to execute a minor deviation Tuesday, August 23 that will release water from Lake Okeechobee as part of an ongoing sediment study by the South Florida Water Management District (SFWMD) and the U.S. Geological Survey (USGS).
  • USACE seeks comments on LOSOM Draft NEPA documents

    The U.S. Army Corps of Engineers Jacksonville District (USACE) announces a 45-day public comment period for the Lake Okeechobee System Operating Manual (LOSOM) Draft Environmental Impact Statement (EIS). Comments are due Monday, September 12, 2022. The draft documents and instructions on how to provide comments are available at www.saj.usace.army.mil/LOSOM.
  • USACE reduces target flows from Lake Okeechobee to the Caloosahatchee

    The U.S. Army Corps of Engineers (USACE) Jacksonville District will reduce target flows from Lake Okeechobee to the Caloosahatchee beginning Saturday, July 9, as lake levels remain steady and local basin runoff has been adequate to maintain salinity levels in the estuary. The releases to the Caloosahatchee Estuary will target a pulse release at a 7-day average of 750 cubic feet per second (cfs) from the W.P. Franklin Lock and Dam (S-79). This is a reduction from the 1,000 cfs targeted pulse release that has been in effect since April 30.
  • Lake Okeechobee releases planned for Sediment Study on June 22

    The U.S. Army Corps of Engineers (USACE) Jacksonville District plans to execute a minor deviation June 22 that will release water from the lake as part of an ongoing sediment study by the South Florida Water Management District (SFWMD) and the U.S. Geological Survey (USGS). The releases will affect only the Julian Keen, Jr. Lock and Dam (S-77) as water is released to support the study.
  • Review of LOSOM draft documents scheduled for summer 2022

    The release of the Lake Okeechobee System Operating Manual draft Environmental Impact Statement and Water Control Plan documents for review by federal, state, tribal partners and members of the public has moved to mid-summer because feedback from the initial draft documents requires additional analysis by the U.S. Army Corps of Engineers Jacksonville District.