The Corps team arrives on site before sunrise to begin dewatering the Ortona Lock.
The Corps team arrives on site before sunrise to begin dewatering the Ortona Lock.

Download Image: Full Size (0.06 MB)
Photo by: Jennifer Oelmann |  VIRIN: 180605-A-A1411-051.JPG