The crane operator begins the installation by setting a steel I-beam into the girder recess notch in the lock wall, starting with the upper or upstream end of the lock.
The crane operator begins the installation by setting a steel I-beam into the girder recess notch in the lock wall, starting with the upper or upstream end of the lock.

Download Image: Full Size (1.6 MB)
Photo by: Erica Skolte |  VIRIN: 180605-A-ZO284-053.JPG