Beach renourishment on both sides of Sunny Isles Beach Pier
An eroded area on both sides of the pier will be renourished with a total of 280,000 cubic yards of beach-quality sand will be trucked in from an upland sand mine and placed on the shoreline during the Sunny Isles Beach shoreline renourishment project.