Kissimmee River Restoration
Backfill work continues as part of the C-38 Reach 3 Backfill construction contract. Similar backfilling operations will be conducted as par of the recently awarded Reach 2 Backfill construction contract.

Download Image: Full Size (0.1 MB)
Photo by: South Florida Water Management District |  VIRIN: 160323-A-CE999-100.JPG