Ports projects are focus of 2012
The Jacksonville Harbor Deepening Study, included in President Obama’s “We Can’t Wait” initiative, is being conducted on an expedited schedule. The Jacksonville Harbor (Mile Point) Navigational Study achieved a signed Chief of Engineers’ Report and Project Design Agreement, critical steps in moving the project to Congressional authorization and appropriation.

Download Image: Full Size (1.32 MB)
Photo by: USACE |  VIRIN: 121112-A-CE999-002.JPG