Naples to Big Marco Pass FL (O&M)

March 2018


FACT SHEET

Naples to Big Marco Pass FL (O&M)

Operations & Maintenance

Congressional Districts: 19, 25

1. DESCRIPTION

The project includes the southerly 10.15 miles of the waterway from Naples to Big Marco Pass and 4.5 miles of waterway from Naples to Gordon Pass. An interior channel 6 x 70 feet from southerly limits of the town of Naples to Big Marco Pass; a channel 12 x 150 feet from that depth in the Gulf to Gordon Pass, thence 10 x 100 feet through Gordon Pass and Naples Bay to a point 400 feet south of the U.S. 41 highway bridge, thence 10 x 70 feet to the bridge; and a turning basin 8 x 150 x 200 feet in upper Naples Bay; and a turning basin 8 x 250 x 670 feet at the municipal yacht basin.

2. FUNDING

Allocation for FY18 $0
President's Budget for FY19 $0

3. SPONSOR

Collier County
3300 Santa Barbara Blvd.
Naples, Florida 34116 

4. STATUS

Project was completed in 2016 for cuts 1, 3, and 4 to the authorized project depth by removing 80,000 cubic yards of material from the Federal channel and placed on the beach at Keewaydin Island. The Jacksonville District continues to perform project condition surveys of the Federal channel.

Naples to Big Marco Pass Operations and Maintenance project map