CERP Broward County Water Preserve Areas (C)

March 2018

FACT SHEET

COMPREHENSIVE EVERGLADES RESTORATION PLAN
Broward County Water Preserve Areas

Construction General (C)

Congressional Districts: 20, 21, 22, 23, 24, 25

 

1. DESCRIPTION

This project is composed of three (3) components: C-11 Impoundment, C-9 Impoundment, and Water Conservation Area (WCA) 3A/3B Levee Seepage Management, which was authorized by the Water Resources Reform Development Act (WRRDA) 2014. The impoundment areas will 1) aid in reducing seepage from the WCA 3A/3B Seepage Management Area, 2) provide groundwater recharge, 3) provide additional water supply to urban areas, and 4) help prevent saltwater intrusion. The purpose of the WCA 3A/3B Levee Seepage Management system will focus on seepage reduction by allowing higher water levels in the L-33 and L-37 borrow canals. The purpose of the C-11 Impoundment is to direct runoff from the western C-11 drainage basin into the impoundment in lieu of pumping the untreated runoff via the S-9 Pump Station into the WCA 3A. If water is not available in the impoundment area to perform these functions, S-381 will be opened to allow seepage water to recharge the basin and prevent excessive dry outs. In addition, seepage will be collected and returned to the impoundment area. The purpose of the C-9 Impoundment is to pump runoff from the western C-9 drainage basin and diverted water from the western C-11 Basin into the impoundment. As a result, this impoundment will assist in reducing seepage from the WCA 3A/3B Levee Seepage Management.

2. FUNDING

Estimated Total Cost $1,033,900,000
Estimated Federal Cost $516,900,000
Allocation thru FY17 $436,656,000
Allocation for FY18 $0
President’s Budget FY19 $0

3. SPONSOR

South Florida Water Management District (SFWMD)
3301 Gun Club Road
West Palm Beach, Florida 33406

4. STATUS

The project was authorized for construction by the Water Resources Reform and Development Act of 2014 (WRRDA 2014). The Project Partnering Agreement (PPA) for the BCWPA project was executed in fiscal year 2016.


Construction of the three project components will start with the C-11 Impoundment component (C-11), followed by the WCA 3A/B Levee Seepage Management (SMA) component, and finally the C-9 Impoundment component (C-9).


The Corps awarded a construction contract for the Mitigation Area A Berm a portion of the C-11 component in September 2017. The Broward County WPA project was not funded in the FY18 President’s budget nor is it in the FY19 President’s budget. Based on the current funding constraints, the next construction contract for the C-11 impoundment is scheduled for FY22. The remaining project features are currently scheduled to be awarded in FY27 and FY30, subject to funding availability.

 map of Broward County WPA project area map of C-11 Impoundmentand Seepage Management Area