Inspection of Completed Works FL (O&M)

May 2023

FACT SHEET

Inspection of Completed Works, FL (O&M)
Operations and Maintenance
Congressional Districts: 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 16, 
17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28

 

1. DESCRIPTION

The Inspection of Completed Works (ICW) program includes the inspection of federal flood control projects which have non-federal sponsors responsible for operation, maintenance, repair, replacement, and rehabilitation (OMRR&R) or as otherwise specified in Project Cooperation Agreements (PCA), Local Cooperation Agreements (LCA), and other agreements based on Section 221 of the Flood Control Act of 1970 (PL) 91-611) or other legislation. The primary purposes of these inspections are to prevent loss of life and catastrophic damages; preserve the value of the Federal investment; and to encourage non-federal sponsors to bear responsibility for their own protection. This program is to assure sponsor compliance with existing agreements that the structures and facilities constructed by the United States for flood protection will be continuously maintained in such a manner and operated at such times and for such periods as necessary to obtain the maximum benefits. The district program includes the above listed congressional districts.

2. FUNDING

Allocation for FY23 $1,033,000
President’s Budget FY24 $880,000

 

3. SPONSORS

St. John’s River Water Management District
P.O. Box 1429
Palatka, Florida 32178-1429

Southwest Florida Water Management District 
2379 Broad Street
Brooksville, Florida 34604-6899

South Florida Water Management District
3301 Gun Club Road
West Palm Beach, Florida 33406

4. STATUS
The O&M funding allocated in FY 2023 will be expended to inspect federally authorized/constructed flood risk reduction projects that are operated and maintained by a non-federal sponsor to comply with federal regulations and policies for flood control projects. Funds will be expended to conduct coordinated inspections on the most critical aspects of the system which contains 930 miles of levees and 300 structures within the Florida Area of Responsibility. The O&M portfolio and the Dam and Levee Safety Programs have increased the sponsor’s superintendent responsibilities to ensure safety for their respective constituents. As a result, funding has increased in recent years. However, despite efficient business practices, the FY 2023 funding is inadequate to support all of the district’s project portfolio and the requirement to comply with all HQ direction on dam and levee inspections.