US Army Corps of Engineers
Jacksonville District Website Website

St. Augustine Harbor, FL (O&M)

March 2019

FACT SHEET

St. Augustine Harbor, FL (O&M)
Operations & Maintenance
Congressional Districts: 4, 6

1. DESCRIPTION

The authorized project consists of a channel 16 feet by 200 feet along the best natural alignment as may exist across the new inlet bar, thence 12 feet deep to the Intracoastal Waterway; a sand-trap groin on north side of the inlet extending seaward from shore of Vilano Beach, and a sand-tight jetty on south side of channel extending seaward from shore of Conch Island parallel to and coextensive with the groin; future landward extension of the groin and jetty; and a channel 10 feet by 100 feet in San Sebastian River from the Intracoastal Waterway to King Street Bridge, with a turning place near the upper end.

2. FUNDING

Allocation for FY19 $0
President’s Budget FY20 $0
 

3. SPONSOR

St. Augustine Port Waterway and Beach District
P.O. Box 298
St. Augustine, Florida 32084

4. STATUS

Nothing significant to report at this time. Annual shoaling surveys continue.

The PDT initiated PED on 15 Feb 2018 for the St. Augustine, North Groin Repair and Sand Tightening Contract. Award occurred 06 Nov 1018 and construction completed before March 2019.